Similar Projects
Corner Repair FY22-23 - Citywide ADA Bid # 2
Infrastructure
Bidding
$200,000 est. value
Kansas City, MO

Corner Repair FY22-23 - Citywide ADA
Infrastructure
Bidding
$200,000 est. value
Kansas City, MO

Athletic and Parking Improvements Package B and Asphalt Improvements
Post-Bid
Independence, MO 64055

Kansas City MoDOT Parking Lot Paving
Infrastructure
Post-Bid
Kansas City, Lees Summit, MO

East Side of Ward Parkway - W 83rd Street to W 84th Street
Results
Less than $110,995 est. value
Kansas City, MO 64114

Marlborough Community Infrastructure - Package 3 Hickman Mills Drive
Results
Kansas City, MO

Sidewalks FY22-23 - CWA Citywide 2
Infrastructure
Bidding
$200,000 est. value
Kansas City, MO

Asphaltic Paving and Striping of City Hall Parking Lot
Infrastructure
Post-Bid
Greenwood, MO 64034

Street Cut Repairs
Results
Independence, MO

SLBE Vernon Court Sidewalks (West Side)
Infrastructure
Bidding
$300,000 est. value
Raytown, MO 64133

18th Street Pedestrian Mall Engineering Services
New Construction
Post-Bid
Kansas City, MO 64108

Pavement Repairs at District Transportation Building
Results
Grandview, MO 64030

Sidewalk and Curb Repair
Infrastructure
Bidding
Independence, MO

63rd Street Reconstruction - Woodland Avenue to Prospect Avenue
Infrastructure
Post-Bid
Kansas City, MO 64121

SLBE 73rd St Jefferson to Pennsylvania Ave
Renovation
Results
Less than $49,275 est. value
MO

Last Updated 06/17/2022 12:59 AM
Project Title

Curb Repair FY23 Program

Physical Address View project details and contacts
City, State (County) MO   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of concrete curb and gutter, concrete sidewalks, driveway approaches, placement of ADA compliant sidewalk ramps, removal of asphalt pavement, provide traffic control, restore landscaping, asphalt patching and other subsidiary work as specified in the Contract Documents, including all materials, labor, equipment, supervision, and any other items necessary to complete the work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents