Similar Projects
Upcoming: Ballistic Windows
Alteration
Design
San Jose, CA

Upcoming - Sleeve Valve
Term Contract, Alteration
Design
San Jose, CA

Janitorial Services
Term Contract
Sub-Bidding
Palo Alto, CA 94301

Fire Life Safety System Repairs
Term Contract
Post-Bid
$200,000 est. value
CA

Graphic Design Services
Term Contract
Post-Bid
San Jose, CA

Digester Cleaning and Equipment Services
Alteration
Results
San Jose, CA

Whole Structure Fumigation
Term Contract
Results

Ada Improvements To Elmwood Barracks 2
Term Contract
Post-Bid
$110,602,700 est. value
Milpitas, Santa Clara, CA 95035

(Multi-Provider) Positive Location of Underground Utility Facility (Potholing) Services
Term Contract
Results
$1,266,377 CJ est. value
Alameda, CA 94501

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Window Cleaning Services at Mineta San Jose International Airport
Term Contract
Post-Bid
San Jose, CA 95110

Janitorial Services
Term Contract
Post-Bid

Sweeping Services
Term Contract
Post-Bid
Santa Clara, CA

Snow Removal Service
Term Contract
Post-Bid

Subpoena Services
Term Contract
Post-Bid
San Jose, CA

Last Updated 07/12/2023 03:35 AM
Project Title

Enhanced Cleaning Services for the San Jose Downtown Transit Mall and Pedestrian Corridor

Physical Address View project details and contacts
City, State (County) San Jose, CA 95113   (Santa Clara County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor will provide cleaning services to enhance the appearance of the San Jose Downtown Transit Mall and Pedestrian Corridor for the community and its visitors. The Corridor stretches along North First and Second streets between Saint James and San Carlos streets along the intermodal transit corridor. This is a total length of area (both sides) of approximately 1.35 miles or .7 miles in each direction. Question Submission Deadline:March 22, 2023, 4:00pm

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents