Similar Projects
Urbana Apartments
New Construction
Conception
San Marcos, TX

Hemphill Creek 12-inch, 24-inch, 27-inch Wastewater Main - 564 - City of San Marcos
Infrastructure
Conception
$8,400,000 CJ est. value
San Marcos, TX 78666

Avery Ranch Apartments
New Construction
Design
Austin, TX

Apartments
New Construction
Design
Buda, TX

Midtown Drainage Improvement Project
Infrastructure
Bidding
$2,800,000 CJ est. value
San Marcos, TX 78666

Briarwood Waterline Improvements
Infrastructure
Bidding
$1,611,413 CJ est. value
San Marcos, TX 78666

Loop 82 and Bobcat Stadium
Infrastructure
Post-Bid
$68,931 CJ est. value
San Marcos, TX 78666

RFQ Engineering - Parks and Recreation Architectural and Engineering Design Services Garison Park
Infrastructure, Renovation
Post-Bid
$500,000 CJ est. value
Buda, TX 78610

Brush Square - Phase 1 Implementation
Infrastructure
Results
$2,200,000 est. value
Austin, TX

Stephenville Metal Building
New Construction, Infrastructure
Results
$37,146 CJ est. value
Austin, TX 78701

Sunfield WWTP Expansion to 0.99 MGD - Package 3A
Addition, Demolition, Renovation, Infrastructure
Construction
$25,000,000 CJ est. value
San Marcos, TX 78666

Honey Market / Buddies Market
New Construction, Infrastructure - 6,249 SF
Construction
$2,500,000 CJ est. value
Buda, TX 78610

Champions Crossing Apartments
Renovation
Pending Verification
San Marcos, TX 78666

Montage Mixed-Use / South Lamar
New Construction, Infrastructure - 310,661 SF
Pending Verification
$66,500,000 CJ est. value
Austin, TX 78704

Harris Hill Road Water Line - 660 - City of San Marcos
Infrastructure
Conception
$2,350,000 CJ est. value
San Marcos, TX 78666

Last Updated 11/28/2022 01:32 PM
Project Title

Kissing Tree / Club House

Physical Address View project details and contacts
City, State (County) San Marcos, TX 78666   (Hays County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 28 2022, this project has not submitted any building applications to the City of San Marcos. An architect has been selected. Information regarding a general contractor has not been disclosed. A firm construction timeline has yet to be established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

6,921 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents