Similar Projects
Dutchess County Youth Opportunity Center - Dutchess County
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Poughkeepsie, NY 12601

Water Storage Facility - Dutchess County
New Construction, Infrastructure
Conception
$6,992,700 CJ est. value
Poughkeepsie, NY 12601

Store Space Self Storage
New Construction, Infrastructure - 41,257 SF
Design
$4,400,000 CJ est. value
Poughkeepsie, NY 12601

Concrete Stoop, Steps, Sidewalk, Handrail Replacement and Masonry Chimney Repairs
Renovation, Infrastructure
Design
$400,000 CJ est. value
Poughkeepsie, NY 12601

Town of Amenia Extension of Route 44 Sidewalk
Infrastructure
Bidding
$200,000 CJ est. value
Amenia, NY 12501

Town of Amenia Extension of Route 44 Sidewalk
Infrastructure
Bidding
$200,000 CJ est. value
Amenia, NY 12501

Snow Plowing and Snow/Ice Removal Services
Post-Bid
Arlington, Poughkeepsie, NY 12603

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Replacement of Bridge C-11 - Fiddler's Bridge Road over Little Wappinger Creek
Renovation
Results
Rhinebeck, NY

Wrong Way Driving and Low Clearance Bridge Counter Measures, r8
New Construction
Results
$1,500,000 est. value

Wappingers C.S.D. - 2022 District Wide Renovations - Phase 4 - Site Work - S.1
Term Contract, Infrastructure
Construction
$900,000 CJ est. value
Hopewell Junction, NY 12533

Wappingers C.S.D. - 2022 District Wide Renovations - Phase 4 - Site Work - S.1
Term Contract, Infrastructure
Construction
$900,000 CJ est. value
Hopewell Junction, NY 12533

819 Main Street Mixed-Use Development
New Construction, Infrastructure - 10,634 SF
Pending Verification
$4,100,000 CJ est. value
Poughkeepsie, NY 12601

Main Street Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Beacon, NY 12508

Allspace Storage Facility Expansion
Addition, Demolition, New Construction, Renovation, Infrastructure - 43,400 SF
Design
$4,700,000 CJ est. value
Poughkeepsie, NY 12603

Last Updated 09/26/2022 03:07 PM
Project Title

Bulls Head Road Bridge Replacement - Dutchess County

Physical Address View project details and contacts
City, State (County) Stanfordville, NY 12581   (Dutchess County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected April 2019
Bids Due View project details and contacts
Estimated Value $2,411,057 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Dutchess County this month plans to begin the roughly $2.4 million process of replacing a bridge on Bulls Head Road in Stanford. The construction will lead to occasional lane restrictions, according to the county Department of Public Works. Bridge S-37, located near the Depot Lane intersection, has experienced structural deficiencies over the years that have led to weight restrictions, according to a release from the department. Dutchess is set to realign Bulls Head Road and construct a new bridge adjacent to the current structure. This will allow "the road to remain open during construction with only occasional lane restrictions for certain operations such as moving equipment and materials," according to the release. Both lanes of the road and the new bridge are expected to be complete by November. The removal of the current bridge and the final site restoration is then expected to be complete by spring 2020. As crews direct traffic onto the newly renovated Bulls Head Road and newly constructed bridge in the late-summer or the fall, there will then be periods of one-way alternating traffic patterns, the county said. The project cost will partially be funded by a $1.68 million grant from the state's BridgeNY program, according to the county. The new bridge will be wider, to allow for the addition of shoulders as well as a guide rail to be installed along the road and the bridge. Bulls Head Road will also be widened and straightened to improve the safety of the approach to the bridge, according to the release. Anyone seeking more information on the bridge replacement project can call the Department of Public Works' Engineering Division at 845-486-2925. Per the owner, as of April 17, 2019, Lochner Construction is the designer and inspector and Winn Construction is the general contractor. Construction is anticipated to begin in April 2019.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents