Similar Projects
2022 Air Conditioning and Lighting
Alteration
Post-Bid
Ann Arbor, MI

Rooftop Solar Array Project at Bryant Elementary School
Alteration
Post-Bid
Ann Arbor, MI 48108

LED Lighting
Results
Ann Arbor, MI

AC and Lighting for Eberwhite
Alteration
Results
Ann Arbor, MI 48103

WWTP Switchgear Improvements
Alteration
Post-Bid
$3,200,000 est. value
Ypsilanti, MI 48198

AC Lighting Bach
Alteration
Results
Ann Arbor, MI 48103

North Campus Auxiliary Support Building
Alteration
Post-Bid
Ann Arbor, MI 48109

Forsythe Middle School Renovation and Wines Elementary School AC/Lighting BP 11
Renovation, Alteration
Results
Ann Arbor, MI 48103

Maintenance and Related Services for Electrical Distribution Systems at DTW and YIP
Alteration
Post-Bid
Ypsilanti, MI

Lighting Fixtures
Term Contract, Alteration
Post-Bid
Dexter, MI

Electrical and Instrumentation Support Services
Term Contract
Post-Bid
Ann Arbor, MI

Structured Wiring Services
Term Contract
Post-Bid
Ypsilanti, MI

Fuel Bay Upgrades - Fuel Conditioning System
Renovation
Post-Bid
$165,000 CJ est. value
Ann Arbor, MI 48105

LED Lighting Fixtures for Washtenaw County Buildings
Term Contract
Post-Bid
$200,000 CJ est. value
Ann Arbor, MI 48108

Uninterruptible Power Supply | Leibert NX Battery Replacement | Ann Arbor VAMC
Renovation
Post-Bid
$50,000 CJ est. value
Ann Arbor, MI 48109

Last Updated 03/14/2023 09:08 AM
Project Title

Womens Huron Valley - Boiler Replacement

Physical Address View project details and contacts
City, State (County) Ypsilanti, MI 48197   (Washtenaw County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $5,165,517 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Building Construction, Industrial (Warehouse, Etc.) Work includes: Replacement of three boilers, associated changes to electrical, small amount of structural and architectural changes and addition of new Glycol System. ALL questions should be emailed to Bruce Browning at bbrowning@towerpinkster.com no later than 2:00 p.m., Eastern on 1-24-2023.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents