Similar Projects
Sources Sought Water and Wastewater
Post-Bid
Talladega, AL - Danbury, CT - Marianna, Miami, Tallahassee, FL - Atlanta, Jesup, GA - Ashland, KY - Devens, MA - Fairton, NJ - Elkton, OH - Allenwood, Lewis Run, Lewisburg, PA - Guaynabo, PR - Bennettsville, Edgefield, Estill, SC - Alderson, Beaver, Bruceton Mills, Morgantown, Welch, WV

Winchester - Phase II Sanitary Sewer Rehabilitation
Post-Bid
$930,000 est. value
Winchester, MA

A Street and Hemenway Pump Station Improvements - General Bid
Results
$403,800 est. value
Framingham, MA

Water and Sewer Main Services
Results
Ayer, MA

Furnish and Deliver Catch Basins Frames and Grates, Manholes Frames, Covers
Term Contract
Post-Bid
Lowell, MA 01852

Area 13 14B Sewer and Manhole Rehabilitation Project
Results
Waltham, MA

Service, Maintenance and Emergency Repair to Utilities
Post-Bid
Less than $50,000 est. value
Wakefield, MA

Phase 6 Sewer System Improvements
Results
$2,200,000 est. value
Lexington, MA

Furnish and Deliver Water, Wastewater and Drainage Materials
Post-Bid
Framingham, MA 01702

FY 19 Sewer, Storm Drain and Combined System Trenchless Lining and Point Repair
Results
Less than $2,000,000 est. value
Cambridge, MA

Pelham Road Sewer Improvements
Post-Bid
Less than $450,000 est. value
Lexington, MA

Laprise Village Sewer Service Repair
Results
Less than $18,000 est. value
Medford, MA

Phase 2 Sewer Project
Post-Bid
Less than $9,000,000 est. value
Tyngsborough, MA

Catch Basin Cleaning Services
Results
Framingham, MA 01702

Woonsocket Toe Drain
Post-Bid
$100,000 to $500,000 est. value
Concord, MA 017422751

Last Updated 11/30/2018 11:07 AM
Project Title

Interchange 12 Sewer Interceptor - Phase 1

Physical Address View project details and contacts
City, State (County) Framingham, MA   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,364,921
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Install approximately 3,825 feet of 30-inch CCFRPM sewer pipe and connect to the Northwest Interceptor on the downstream end and to the 9/90 Interceptor on the upstream end.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents