Similar Projects
The Greenbelt Mixed Use
New Construction, Infrastructure
Conception
$125,000,000 CJ est. value
Greenville, TX 75402

2021-2022 Texas Community Development Block Grant Program
Infrastructure
Design
$500,000 est. value
Lone Oak, TX 75453

National Chain Retail Store / Quinlan
New Construction, Infrastructure - 27,701 SF
Design
$4,500,000 CJ est. value
Quinlan, TX 75474

Texas Roadhouse / Greenville
New Construction, Infrastructure - 7,831 SF
Bidding
$2,000,000 CJ est. value
Greenville, TX 75401

Texas Roadhouse / Greenville
New Construction, Infrastructure - 7,831 SF
Bidding
$2,000,000 CJ est. value
Greenville, TX 75401

IH0030 - Debris Removal
Term Contract
Sub-Bidding
$337,560 CJ est. value
Greenville, TX 75402

IH0030 - Dense Graded Hot Mix
Term Contract
Sub-Bidding
$655,000 CJ est. value
Greenville, TX 75402

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Paving Improvements to Serve Trailstone Phase 4
Infrastructure
Post-Bid
Caddo Mills, TX 75135

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Terrell Road Substation Construction Civil Site Improvements Phase 1
Infrastructure
Results
Greenville, TX 75402

Red River Credit Union Greenville Branch
New Construction, Infrastructure - 1,995 SF
Construction
$1,000,000 CJ est. value
Greenville, TX 75402

Pulse Mart At Wolfe City Plaza
New Construction, Infrastructure - 8,126 SF
Pending Verification
$2,000,000 CJ est. value
Greenville, TX 75401

RFQ Design - Agricultural Multipurpose Education and Training Center Project
New Construction, Infrastructure
Pending Verification
$95,000,000 CJ est. value
Commerce, TX 75428

Allsup's #102431 Greenville / Convenience Store
New Construction, Infrastructure - 5,630 SF
Design
$600,000 CJ est. value
Greenville, TX 75401

Last Updated 03/29/2023 11:26 AM
Project Title

SH 276 By-Pass / CSJ: 1290-07-001 - Texas Department of Transportation - Paris District Office

Physical Address View project details and contacts
City, State (County) Quinlan, TX 75474   (Hunt County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $138,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://news.yahoo.com/txdot-announces-road-projects-hunt-154900004.html TxDOT announces road work projects In Hunt County, area for coming week Jul. 16--The Texas Department of Transportation Paris District has announced road improvement/repair projects planned in Hunt County and the surrounding area for next week: Paris -- Here's a look at work planned in Hunt and Rains Counties for the week starting July 18, 2022. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades, and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems. County Road 1032 (bridge replacement project), Hunt County -- The contractor has set barricades and advanced warning signs. Preparation of the right of way is complete and the bridge has been removed. Drill shafts and columns have been poured. Abutment work is complete. Please be aware of workers and watch for work zones when traveling in this area. FM 903, Hunt County: From US 380 to FM 1569 South. The contractor has begun reworking existing base material and subgrade widening. The contractor plans to begin placing geo-grid operations followed by the second lift of flex base. Please be aware of workers and watch for work zones when traveling in this area. FM 275, Rains County: from SH 19 to FM 514. The contractor continued concrete culvert structures, forming, and pouring the wing-walls. The contractor completed the first course of seal coat through the majority of the project. The project's channel excavation is nearly complete and grading for the riprap is complete at the Lake Fork Creek bridge. The contractor could begin hotmix operations for mailbox turnouts and bridge approaches in early August. Please be aware of workers and watch for work zones when traveling in this area. SH 276, Hunt County: from FM 36 to SH 34 (Quinlan Bypass). The contractor completed the concrete paving on the intersection of SH 276 and FM 264. The contractor is working on the culvert extension on the west section SH 276. The contractor is working on ditch and back slope grading -- preparing areas for scheduled temporary seeding and addressing sidewalks and ADA ramp installation. Please be aware of lane closures and watch for work zones and workers when traveling in this area. FM 1566, Hunt County: from FM 272 near Celeste to State Highway 34. The contractor has finished mailbox turnouts. The contractor has finished working on proposed signs for the project. The contractor completed the placement of permanent striping and profile pavement markings. Please be aware of work zones and workers when traveling in this area. Maintenance crews for both Hunt and Rains County will be performing various overlay and potholing operations. Hunt County maintenance crews will be performing base repair and herbicide operations. Maintenance crews will be installing mailboxes, delineators, and signs in various locations. Please be careful when traveling in these areas, watch out for workers and maintain a safe distance from work crews. _____________________________ Project Name: SH 276 By-Pass Facility Name: CSJ: 1290-07-001 Location Address: From .024 Miles East of FM 36 to SH 34 in Quinlan Quinlan, TX 75474 Location County: Hunt Start Date: 11/1/2020 Completion Date: 11/1/2023 Estimated Cost: $138,000 Scope of Work: Construct 5 Lane roadway with signalized intersections, sidewalk and curb ramps Square Footage: 19,200 ft 2 As of August 10, 2020, information regarding a design team or a general contractor is not available. Construction is anticipated to begin on November 1, 2020. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents