Similar Projects
Building Inspections and Customer Utility Services Counters Project
Bidding
Plano, TX

Y1da--674A4-21-001 Create Seclusion Rooms B94 (Padding)
Bidding
$25,000 to $100,000 est. value
Waco, TX 76711

Clear Creek ISD Package 3 Vestibule Upgrades Project
Post-Bid
Columbus, TX

Drinking Fountain Replacement
Post-Bid
Less than $450,000 est. value
TX

Anti-Ligature Related Facility Alterations - at Rusk State Hospital
Renovation
Results
$4,800,741 est. value
Rusk, TX 75785

Gray Hall Vivarium Restoration
Results
Less than $909,000 est. value
Houston, TX 77004

Van Horn Wall Finishing
Bidding
Austin, TX 78773

Bath House Cultural Center Selected Interior Rehabilitation and Site Improvements
Post-Bid
Dallas, TX 75218

Design, Material and Installation of Acoustic Panels
Results
Less than $52,039 est. value
Abilene, TX 79602

Y1dz--Install and Provide Two Each 60` Flagpoles
Bidding
$25,000 est. value
Amarillo, TX 79106

Hill County Covington Street Annex Facade and Interior Renovations
Renovation
Post-Bid
Hillsboro, TX 76645

Rusk State Hospital Ceiling Tile Replacement
Results
$60,000 est. value
Rusk, TX 75785

Residential Renovations
Bidding
Tyler, TX

Walls and Finish - New Weight Room
Post-Bid
Kemp, TX 75143

Drywall Services
Results
Less than $150,000 est. value
Round Rock, TX 78664

Reported 07/17/2020 12:00 AM
Project Title

Contract to Repair the Interior of the Theodore Johns Library

Physical Address View project details and contacts
City, State (County) Beaumont, TX 77705   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The location of the proposed work is 4255 Fannett Road, Beaumont, Texas. The Contractor shall confine his use of the site to the portion indicated on the plan except as required by the Contract Documents to do work outside of that area. The scope of the work shall consist of, but not be limited to the following: a. Clean, repair, and paint the existing interior drywall located around four (4) large windows on the north wall of the library. b. Replace nine (9) 2’x2’ lay-in ceiling tiles as noted on the project drawings. c. Contractor will be responsible for verifying exact quantities, as needed to complete the project as specified. d. The facility will be in full operation while the scheduled work is in progress.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents