Similar Projects
Havana Street and Meridian Boulevard Intersection Improvement Project
Infrastructure
Bidding
CO

Mainstreet and Twenty Mile Road Intersection Improvements
Infrastructure
Bidding
CO 80138

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

2021 Community Roadwork
Infrastructure
Post-Bid
Highlands Ranch, CO 80126

Peoria Street Widening Project
Results
Less than $1,058,887 est. value
Castle Rock, CO

2020 Road Repair Project
Results
Castle Rock, CO 80108

Plum Creek Parkway Widening Phase 2
Infrastructure
Bidding
Castle Rock, CO 80108

2021 Woodmoor Mountain Road Project
Infrastructure
Post-Bid
CO

Canyons Filing 1 3rd Amendment Storm Roadways Water and Sanitary
Results
Lone Tree, CO

2021 Miscellaneous Concrete Replacement Project
Infrastructure
Post-Bid
Castle Rock, CO

2021 Townwide Resurfacing Program
Results
Parker, CO

CMGC services for the Crystal Valley Interchange Project
Renovation, Infrastructure
Post-Bid
Castle Rock, CO

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

2022 Asphalt Overlay Project
Infrastructure
Post-Bid
Castle Rock, CO

2021 Street Overlay
Results
Lone Tree, CO

Last Updated 03/22/2022 03:44 AM
Project Title

2022 Townwide Reconstruction Program

Physical Address View project details and contacts
City, State (County) Parker, CO   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction of Plaza Drive from Twenty Mile Road to Dransfeldt Road. Work includes but is not limited to 4,800 square yards of concrete pavement removal; 1,950 cubic yards of unclassified excavation; 1,950 cubic yards of aggregate base course; 2,350 tons of hot mix asphalt; 364 concrete pavement and 700 square yards of concrete sidewalk. In addition, there is also associated signalization, clearing/grubbing, landscape restoration, pavement markings and traffic control. Reconstruction/resurfacing work of Arezzo Circle from Ventana Street to Bolero Drive. Work includes but is not limited to 815 square yards of full depth asphalt; 2,000 lineal feet of 1.5” edge mill asphalt; 550 tons of hot mix asphalt and 80 square yards of concrete sidewalk removal & replacement. In addition, there is also associated erosion and traffic control necessary to complete the program.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents