Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

RFQ D/B - I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Heavy Civil General Contractor/Construction Manager Services for Atlantic Base Yard Refurbishment Project
Infrastructure
Post-Bid
$22,000,000 est. value
Seattle, WA 98134

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

SR 516 - Jenkins Creek to 185th Pl SE
Infrastructure
Results
Covington, WA 98042

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

Western Avenue Apartment Building
Demolition, New Construction, Infrastructure
Pending Verification
$56,600,000 CJ est. value
Seattle, WA 98121

SR 520/I-5 to Montlake I/C and Bridge Replacement Project
New Construction
Design
$725,000,000 to $775,000,000 est. value
Seattle, WA 98113

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

124th Avenue NE- NE 12th Street to NE Spring Boulevard
Infrastructure
Results
$8,221,853 est. value
Bellevue, WA 98007

Gridline Apartments
New Construction, Infrastructure
Pending Verification
$66,400,000 CJ est. value
Seattle, WA 98122

Bioretention and Water Quality Treatment at 126th Ave NE
Infrastructure
Design
$214,581 CJ est. value
Kirkland, WA 98033

Last Updated 09/19/2022 10:06 AM
Project Title

Town Center Improvement Project - Phase 3 - PUW20003CIP - City of Snoqualmie

Physical Address View project details and contacts
City, State (County) Snoqualmie, WA 98065   (King County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2025
Bids Due View project details and contacts
Estimated Value $4,504,892 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The intent of this project is to reconstruct portions of State Route 202 (Railroad Avenue) between Northern Street and the State Route 202 Bridge, upgrade the adjacent multi-use path, replace and relocate utilities, as well as add street lighting, streetscape improvements, traffic calming measures, trail and transit connections, and natural landscaping elements. A new pedestrian bridge and gateway features will be addressed through community outreach efforts. This project is included in the city's 2023-2028 Capital Improvement Plan (CIP). As of September 16, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents