Similar Projects
Yorkshire Subdivision
New Construction, Infrastructure
Conception
$6,260,000 CJ est. value
Reno, NV 89501

City Hall - Southeast ADA Ramp Improvements - Construction - City of Sparks
Infrastructure
Conception
$250,000 CJ est. value
Sparks, NV 89431

Spectrum-Dandini Mixed Use
New Construction
Design
Reno, NV 89595

Spectrum-Dandini Mixed Use
New Construction
Design
Reno, NV 89595

Construct Classroom at Main Station Farm
New Construction, Infrastructure - 6,000 SF
Bidding
$4,038,319 CJ est. value
Reno, NV 89502

2-3/4" Cold Mill With 2" PBS With Open Graded Surface
Infrastructure
Bidding
$2,200,000 CJ est. value
Reno, NV 89511

CMAR Terminal Development - Ticketing Hall Expansion
Renovation
Post-Bid
$24,500,000 est. value
Reno, NV 89502

Development of Airport Site for Air Cargo Facilities
Infrastructure
Post-Bid
Reno, NV 89502

5th, 6th, 7th, and G Street Main Replacement
Infrastructure
Results
$831,662 CJ est. value
Reno, NV 89501

Construct Facilities for Softball Program at Hixson Park, Phase 1
New Construction, Infrastructure
Results
$1,515,515 CJ est. value
Reno, NV 89512

Pizza Hut TI
Renovation - 1,386 SF
Construction
$668,911 est. value
Sun Valley, NV 89433

Chuck E Cheese #316
Renovation - 13,432 SF
Construction
Reno, NV 89502

North Shore Biltmore Redevelopment
New Construction
Pending Verification
Crystal Bay, NV 89402

Village Green Commerce Center
New Construction
Pending Verification
Sparks, NV 89441

Maintenance Garage - West Side Parking Lot Rehabilitation - City of Sparks
Infrastructure
Conception
$250,000 CJ est. value
Sparks, NV 89431

Last Updated 02/14/2023 02:15 PM
Project Title

Reno-Tahoe International Airport Master Plan Expansion (More RNO Project) - Ticketing Hall and Lobby Expansion

Physical Address View project details and contacts
City, State (County) Reno, NV 89502   (Washoe County)
Category(s) Commercial, Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Food/Beverage Service, Retail, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $32,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to expand the airport in multiple phases over several years with two new concourses, a new four-story parking garage, ticketing hall and area for pick-up and drop-off. The new concourses will also increase the number of gates, restaurants and retail. Construction will also include a new rental car facility and changes to the baggage claim area. The Reno-Tahoe International Airport's Board of Trustees has approved the plan. The ticketing hall and lobby expansion is part of a larger $500 million multi-phased project. Construction began in September 2022 on the $32 million ticketing hall and will take a year to complete. Road improvements have also begun. The $200 million rental car facility will begin construction in July 2023, with a completion date set for December 2025. The concourse project, estimated to cost more than $300 million, will begin in 2024 and still needs to secure funding. All construction is expected to be complete in 2028.

Details

4 Stories Above Grade, New Construction, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Coiling Doors and Grilles, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Special Function Windows, Security Windows, Door Hardware, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Seating, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents