Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

Culvert Replacement - SR 72
Demolition, New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Leesburg, OH 45135

Culvert Replacement - SR 72
Demolition, New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Leesburg, OH 45135

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Spring Lake Avenue Reconstruction
Results
$625,000 est. value
Hillsboro, OH

Pavement Resurfacing
Results
Lynchburg, OH

Dodson Creek Solar
Alteration
Pending Verification
$117,000,000 est. value
Hillsboro, OH 45133

SR 138 - Bridge Deck
Infrastructure, Renovation
Design
$1,800,000 CJ est. value
Hillsboro, OH 45133

Taxiway, Taxilane, and Apron Crack Repair, Crack Sealing, and Pavement Sealing
Infrastructure
Post-Bid
Hillsboro, OH 45133

2021 Highland County Chip Seal Program
Results
$475,500 est. value
OH

CR 7 Intersection Improvement
Alteration
Design
$789,516 est. value
Hillsboro, OH 45133

2021 Road Program
Infrastructure
Post-Bid
OH

Crack Sealing - CS-FY2022
Results

Last Updated 08/30/2022 03:31 PM
Project Title

Clear Creek Bike Path Connector - State of Ohio

Physical Address View project details and contacts
City, State (County) Paint Township, OH 45133   (Highland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $732,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. This project is in included in the state's FY 2022-2023 Capital Improvement Plan (CIP). As of August 30, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents