Similar Projects
Detention Facility Fire Alarm Design-Build
Post-Bid
Hendersonville, NC 28791

Testing and Inspection of Fire Protection
Term Contract
Post-Bid
Cherokee, NC 28719

Carriage House Fire Alarm System
Results
Less than $250,000 est. value
Raleigh, NC 27600

Market Survey: The FAA is Seeking Interested Sources that are Capable of Design and Construction to Replace the Fire Detection and Annunciation Systems at Numerous Facilities Throughout the United States
Results
$3,000,000 to $5,000,000 est. value

Fire Extinguisher Maintenance
Post-Bid
Cherry Point, NC 28533

Southeast Raleigh Magnet High School Fire Alarm Replacement
Results
Less than $651,425 est. value
Raleigh, NC

DLA Fire Protection MATOC
Post-Bid
$100,000 to $125,000,000 est. value

S--Fire/Smoke Damper Inspection at the Charles George VAMC
Results
Asheville, NC 28805

Six Year Inspection and Testing of Fire and Smoke Dampers at RJ Blackley
Term Contract
Results
$15,320 est. value
Butner, NC

Weil Winfield Fire Alarm Replacement
Results
Greensboro, NC

Museum of History Security Alarm System Maintenance Contract
Term Contract
Results
$8,748 est. value
Raleigh, NC

Z--Fire Pump and Equipment Room
Results
$500,000 to $1,000,000 est. value
Durham, NC 27705

Fire Extinguishers - Purchases and Maintenance
Results
Raleigh, NC

Alter Fire Protection Waterlines
New Construction
Results
$500,000 to $750,000 est. value
Charlotte, NC 28208

Fire Detection & Alarm System Glen Arden Elementary School
Results
Arden, NC

Reported 12/14/2018 12:00 AM
Project Title

Repair Fire Suppression Bldg. 51

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28208   (Mecklenburg County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description This project includes, but is not limited to: Replace Foam/Water Releasing panel, the existing panel is a Siemens CP-35, with a conduit line looping from the bottom to drain any water infiltration. Install surge protection devices to the Foam Releasing panel Install polyethylene insulation on all trim piping Install a 1 ton split AC unit in foam room, install motorized controls to close exhaust fan outlet while AC is on Troubleshoot heat detection devices in high bay hangar area, replace defective devices (no more than 20) Test and commission new panel and devices to ensure system is fully integrated and functional
Details
Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents