Similar Projects
Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, NC

Asphalt Patching Services
Infrastructure
Post-Bid
Columbus, GA

99--Human Performance Training Center - Punisher Ramp Resurfacing
Term Contract
Post-Bid
Fort Benning, GA

LMIG Street Resurfacing
Results
College Park, GA 30337

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

2021 LMIG Project
Results
Mount Vernon, GA

Williams Road at Fortson Road Rouondabout
Infrastructure
Post-Bid
$3,288,952 est. value
Columbus, GA 31914

5.375 Miles of Milling, Inlay and Plant Mix Resurfacing on Sr 22 Spur Beginning East of Barbara Rd and Extending South of Us 80/Sr 22
Results
Columbus, GA 31997

T32-D3-Pavepres-I85 MP 7.8-49.3-123665
Infrastructure
Results

4.888 Miles of Milling, Inlay and Plant Mix Resurfacing
Infrastructure
Results
Columbus, GA 31914

T32-D3-PavePres-SR 85 M and 125067
Infrastructure
Results
GA

0.546 Mile of Reconstruction and Rehabilitation for Turn Lanes on SR 22 at SR 85
Infrastructure
Results
Columbus, GA 31914

0.178 Mile of Reconstruction for Turn Lanes on SR 22 Conn at SR 85
Infrastructure
Results
Columbus, GA 31914

4.844 Miles of Milling, Inlay and Plant Mix Resurfacing on SR 22 Spur Beginning East of SR 1 and Extending East of Barbara Rd and Construction of a Bridge Culvert on SR 22 Spur/Buena Vista Rd Over Weracoba Creek
New Construction, Infrastructure
Results
GA

Reported 07/05/2022 08:36 AM
Project Title

Sr 219 From Sr 1 To Harris County Line

Physical Address View project details and contacts
City, State (County) Columbus, GA 31904   (Muscogee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project, selected by the District Maintenance Office, is the resurfacing at SR 219 to improve the roadways current low PACES rating. County: Muscogee As of July 04, 2022, the project is in Final Planning status. Anticipated letting Month is October, 2022. GADOT - SR 219 From SR 1 to Harris County Line *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents