Similar Projects
Fine Arts Center Fire Lane Drive Replacement
Infrastructure
Bidding
$150,000 est. value
Plano, TX 75075

Legacy Hills Pod 2 Phase 1 Paving Package
Infrastructure
Bidding
Celina, TX

Preston Ridge - Fire Lane Addition
Post-Bid
Frisco, TX 75035

Paving Improvements for Inspiration, Phase 8A
Post-Bid
TX

Southern Region Disaster Recovery Support BPA
Results

Fishtrap Road and Teel Parkway Intersection Improvements and Traffic Signal
Results
$286,225 est. value
Prosper, TX 75078

Melissa Collector Roads Project
Infrastructure
Bidding
$6,300,000 est. value
Melissa, TX 75454

Phase 4A/4C - Bridgewater Paving Package
Post-Bid
TX

Main Replacements & Street Rehab (Northwood Park/Westwood Park Area)
Results
Frisco, TX 75069

Hot-Mix Asphalt, Pothole Repair and Maintenance
Infrastructure
Bidding
Celina, TX

Paving Improvements to Serve Elevon, Phase 1A and 1B
Post-Bid
Lavon, TX

Civil Improvements for the Light Farms Prairie Crossing Re-Alignment
Results
$1,830,367 est. value
Celina, TX 75009

Craig Ranch Intersection Improvements
Infrastructure
Bidding
$50,000 to $100,000 est. value
McKinney, TX 75070

Travis Ranch Phase 2K Paving Improvements
Post-Bid
Dallas, TX

Frisco Rockhill Phase 2 - Paving Improvements
Results
Frisco, TX 75034

Last Updated 12/16/2021 10:26 AM
Project Title

Civil Improvements for the Light Farms Ways - Outerloop Connection

Physical Address View project details and contacts
City, State (County) Celina, TX   (Collin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $430,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Outer Loop EBFR/Light Farms Way Connection work consists of approximately 1,400 CY of Excavation, 2,715 Sq. Yds. of concrete pavement, 40 LF of Storm Drainage, Paving striping, traffic control, SWPPP and Erosion Control Measures and related work in the Light Farms Master Planned Community in Celina, Collin County, TX.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents