Similar Projects
Washington Street Redesign - Newton
Infrastructure
Design
$3,000,000 est. value
Newton, MA 02465

Union Avenue - City Of Framingham
Alteration
Design
$11,000,000 est. value
Framingham, MA

Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, Jacksonville, NC

Clarendon Hill Infrastructure Improvements
Infrastructure
Bidding
$4,050,000 est. value
Somerville, MA 02144

Hot Mix Asphalt Recreation Path
Post-Bid
$132,400 est. value
Lincoln, MA

Milling and Overlay of Misc. Roads (A)
Post-Bid
$675,000 est. value
Hudson, MA

Scheduled and Emergency HMA Pavement and Berm Repairs at Various Locations
Results
Less than $4,330,525 est. value

Resurfacing and Related Work on Sections of Interstates 93 and 495
Results
Less than $6,046,275 est. value
Chelmsford, Medford, Somerville, Stoneham, MA

Box Bridge and Approaches with Hot Mix Asphalt
New Construction, Infrastructure
Bidding
$450,000 est. value
Sudbury, MA

Milling and Overlay of Misc. Roads (B)
Post-Bid
Less than $475,000 est. value
Hudson, MA

Scheduled and Emergency Pavement Repairs and Improvements at Various Locations in Areas A, B and C
Results
$2,876,925 est. value

Roadway Surface Sealing Treatments - Microsurfacing
Term Contract, Infrastructure
Bidding
$214,840 est. value
Ashland, Millis, Natick, Needham, Sherborn, Wellesley, MA

Crack Sealing
Post-Bid
Wakefield, MA

Scheduled and Emergency Resurfacing and Related Work at Various Locations
Results
$2,855,500 est. value

Scheduled and Emergency Pavement Repairs and Improvements at Various Locations in Area D
Infrastructure
Bidding
$1,659,654 est. value

Last Updated 07/15/2022 02:35 AM
Project Title

Road Rehabilitation - Overlay

Physical Address View project details and contacts
City, State (County) Holliston, MA   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $574,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work shall consist of supplying and applying bituminous material to previously prepared existing pavements to be overlaid and each layer of new bituminous course, if more than 12 hours elapses between new layers, in accordance with these specifications applied at the rate specified by the engineer.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents