Similar Projects
Raised Median At El Dorado Street
Infrastructure
Bidding
Stockton, CA

Place Retaining Wall, Sign Structure and CMS Systems
Infrastructure
Bidding
$3,720,000 est. value

U-Channel Guide Post U-Channel Sign Post Tube Post and Tube Post Anchors
Infrastructure
Post-Bid
Placerville, CA

Soundwall Repair and Replacement Services
Infrastructure
Post-Bid
$200,000 est. value
San Jose, CA

Marin County Jail Booking Area Barrier Removal for ADA Compliance
Infrastructure
Results
$159,249 est. value
San Rafael, CA 94903

2020 LNU Fire FHWA Guardrail Replacement Project
Infrastructure
Results
$1,800,000 est. value
CA

Construct Soldier Pile Retaining Wall, Repair RSP and HMA paving
Infrastructure
Bidding
$16,000,000 est. value
CA

Rectangular Rapid Flashing Beacon Project
Infrastructure
Post-Bid
$200,000 est. value
Suisun City, CA

Highway Safety Improvements Program (HSIP) No. 1 Signage Improvements
Infrastructure
Results
$26,000,000 est. value
CA

Upgrade Bridge Rails and Construct Concrete Median Barrier
New Construction, Infrastructure
Bidding
$7,600,000 est. value
CA

Warren Shingle Paving
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
CA

CZU Lightning Complex Guardrail Replacement Project
Infrastructure
Results
$600,027 est. value
Santa Cruz, CA

Roadway Ex, Hydraulic Biotic Growth Med and Midwest Guardrail System
Infrastructure
Bidding
$3,770,000 est. value
Mount Shasta, CA 96067

Highway Safety Improvement Program (HSIP) No. 2 Signage Improvements
Infrastructure
Results
Less than $2,305,000 est. value
CA

Install Metal Beam Guardrails
Infrastructure
Bidding
$16,400,000 est. value
CA

Last Updated 09/06/2021 01:14 AM
Project Title

Place Concrete Barrier

Physical Address View project details and contacts
City, State (County) CA   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $460,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1070030lead Compliance Planlslump Sum 2090100time-Related Overhead (Wday)Wday45 3120090construction Area Signslslump Sum 4120100traffic Control Systemlslump Sum 5120165channelizer (Surface Mounted)Ea9 6120204portable Radar Speed Feedback Sign System Dayea15 7128651portable Changeable Message Sign (Ea)Ea2 8129000temporary Railing (Type k)Lf940 9012130alternative Temporary Crash Cushionea1 10129152temporary Radar Speed Feedback Sign Systemea1 11130100job Site Managementlslump Sum 12130200prepare Water Pollution Control Programlslump Sum 13130640temporary Fiber Rolllf600 14130710temporary Construction Entranceea1 15130900temporary Concrete Washoutlslump Sum 16141120treated Wood Wastelb360 17153248remove Concrete (Miscellaneous) (Sqft)Sqft440 18170103clearing And Grubbing (Ls)Lslump Sum 19190105roadway Excavation (Type z-2) (Aerially Deposited Lead)Cy66 20204008plant (Group h)Ea10,200 21204096maintain Existing Planted Areaslslump Sum 22204099plant Establishment Worklslump Sum 23206400check And Test Existing Irrigation Facilitieslslump Sum 24206402operate Existing Irrigation Facilitieslslump Sum 25206405remove Irrigation Facilitylslump Sum 26208446riser Sprinkler Assembly (Gear Driven)Ea15 272085762 1/2" Gate Valveea2 282085943/4" Plastic Pipe (Schedule 40) (Supply Line)Lf64 292085951" Plastic Pipe (Schedule 40) (Supply Line)Lf200 302085961 1/4" Plastic Pipe (Schedule 40) (Supply Line)Lf310 312085971 1/2" Plastic Pipe (Schedule 40) (Supply Line)Lf160 322087388" Corrugated High Density Polyethylene Pipe Conduitlf2 33390132hot Mix Asphalt (Type a)Ton13 34394090place Hot Mix Asphalt (Miscellaneous Area)Sqyd55 35397005tack Coatton0.1 36839640concrete Barrier (Type 60m)Lf200 37839743(f) - Concrete Barrier (Type 836b)Lf658 38839745(f) - Concrete Barrier Transitionlf10 39839752remove Guardraillf89 40870009maintaining Existing Traffic Management System Elements During Constructionlslump Sum 41872135modifying Traffic Monitoring Stationslslump Sum 42872145removing Traffic Monitoring Stationslslump Sum

Details

Division 01 - General Requirements, Temporary Barriers and Enclosures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents