Similar Projects
Reported | 10/21/2021 12:00 AM |
Project Title | 6th Street Pavement Preservation Phase III |
Physical Address | View project details and contacts |
City, State (County) | Bremerton, WA 98337 (Kitsap County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Consists of preparing engineering, contract documents and plans for improvement of pedestrian and roadway facilities for a single project. Design work for the project will commence in February 2022 and should be completed by November 2023. The 6th Street Pavement Preservation Phase III Project consists of a mill and fill overlay between Naval Avenue and Warren Avenue, including a new traffic signal and ADA ramps at the intersection of 6th Street and Veneta Avenue. Additional project work includes channelization, signing, sidewalk, reconstruction of non-compliant ADA ramps, right of way acquisition, utility upgrades (water, sewer, storm), 3rd party utility coordination, and other related street improvements. The existing roadway is a 4-lane facility (two lanes each direction) with sidewalks on both sides. The City is considering re-channelizing to a three-lane facility (one lane each direction with two way left turn lane) with bike lanes. The City may elect to have the re-channelization completed as part of the project or have the project designed to be forward compatible with a future project to re-channelize to this lane configuration. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |