Similar Projects
Snow Removal Services, Cargo Inspection Facility, Detroit, MI
Design
Detroit, MI 48216

Snow Blowing and Snow Removal Services
Post-Bid
Sault Sainte Marie, MI 49783

Water Sewer Rate Study 2019
Post-Bid
Traverse City, MI 49684

Snow Removal for DEQ 635 Filley Street District Office
Results
Lansing, MI

Waste Disposal and Recycling Services
Results
Less than $60,000 est. value
Wayne, MI

2020 Snowmelt Projects
Post-Bid
Grand Rapids, MI

Lawn Mowing/Snow Removal
Results
Less than $1,860 est. value
Port Huron, MI

Roof Snow Removal at Blackbird Elementary School and Shay Elementary School.
Post-Bid
Harbor Springs, MI

Dart Auditorium-Fire Curtain And Rigging Replacement
Results
Pinckney, MI

Snow and Ice Removal Services for the NEW Sault Ste. Marie Customer Service Center
Post-Bid
Sault Sainte Marie, MI 49783

Property Maintenance
Term Contract
Results
Kalamazoo, MI

Grounds Maintenance and Snow Removal
Post-Bid
Detroit, MI 48207

Neighborhood Stabilization Program - Right of First Refusal
Results
Garden City, MI

Long Rapids Township Snow Removal at its Emergency Facility
Post-Bid
Lachine, MI 49753

Aqueous Film Forming Foam (Afff) Collection and Disposal
Results
Lansing, MI

Reported 04/14/2021 12:00 AM
Project Title

Bulk Trash Collection

Physical Address View project details and contacts
City, State (County) Adrian, MI   (Lenawee County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work include healthful, and aesthetic collection and proper disposal of bulk trash for residential and city-owned facilities within the corporate limits of the City of Adrian. Bulk refuse shall be collected curbside for all city residential buildings of 4 units or less in May 2021 or June 2021 during one (1) collection date or split into two (2) collection dates for the North half and South half of the City. The final collection date(s) shall be approved by the City.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents