Similar Projects
S222--Grease Trap, Grease Tank and Line Cleaning
Post-Bid
Philadelphia, PA

Two (2) Year Requirements Type Blanket for Septic Tank Service
Term Contract
Post-Bid
Philadelphia, PA

Cresheim Creek Interceptor Repair and Ecological Restoration
Results
Philadelphia, PA 19107

Frame and Lid Septa Manhole 28" Dia
Results
Less than $25,000 est. value
Philadelphia, PA

Relay of Water Mains, Reconstruction of Sewers in Hope Street
Infrastructure
Post-Bid
$2,000,000 to $3,000,000 est. value
Philadelphia, PA 19176

Sewer Reconstruction and Relay of Water Mains in Foulkrod Street
Results
$3,000,000 to $4,000,000 est. value
Philadelphia, PA 19124

Frame and Lid Septa Manhole 28" Dia
Infrastructure
Post-Bid
Philadelphia, PA

Emergency Sewer Excavation Repair and Street Restoration
Term Contract
Results
Philadelphia, PA 19102

Frame and Lid SEPTA Manhole 28" Diameter
Alteration
Post-Bid
Philadelphia, PA

Subsurface Utility Locating and Marking Services
Results
Philadelphia, PA

DVVH Sewage Ejector Pit Cleaning
Term Contract
Results
Philadelphia, PA 19154

Sanitary Force Main Reconstruction
Results
$1,000,000 to $2,000,000 est. value
Philadelphia, PA

Sewer Reconstruction and Sewer Lining
Results
$2,000,000 to $3,000,000 est. value
Philadelphia, PA

CCTV Inspection of Sewers
Term Contract
Results
Philadelphia, PA

Sewer Reconstruction and Relay of Water Mains in Thompson Street
Results
$5,000,000 est. value
Philadelphia, PA 19125

Reported 12/10/2021 12:00 AM
Project Title

Rising Sun/Germantown/Ontario Intersection Modifications

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19140   (Philadelphia County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Goal: MBE: 18% - 20% and WBE: 10% - 12%. This work includes all work necessary to install complete and fully usable green stormwater infrastructure surface and sub-surface features in the project areas as shown and described in the Contract Documents. In general, the work includes sawcutting and removal of existing sidewalk and paving; excavation of trenches and disposal of material; excavation and grading of rain gardens, stormwater bumpouts and swales; installation of checkdams and spillways; installation of clean washed stone and geotextile; installation of thermoplastic, ductile iron and RCP drainage pipe and fittings, cleanouts and riser structures; installation of velocity dissipators; installation of observation wells; installation of trench drains and concrete aprons; installation of new stormwater inlets, control structures and laterals; installation and modification of existing inlets, restoration of sidewalks, curbs and streets; planting of trees and landscaping, and placement and grading of specified stormwater and planting soils.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents