Similar Projects
Durango-La Plata County Airport Terminal Expansion - City of Durango
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Durango, CO 81303

Glacier Club Area H Single Family Homes
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Durango, CO 81301

Narrow Gauge Cabins Area H, Phase IV
New Construction, Infrastructure
Design
$1,300,000 CJ est. value
Durango, CO 81301

Silver Spruce Academy
New Construction, Infrastructure - 4,636 SF
Design
$1,600,000 CJ est. value
Durango, CO 81303

RFP Developer - 211 West College Drive Conceptual Public-Private Partnership (PPP)
Infrastructure
Bidding
$20,000,000 CJ est. value
Durango, CO 81301

Lake Nighthorse Entry Station Project
New Construction, Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Durango, CO 81301

R5 Concrete Apron - Durango South Forty yard
Infrastructure
Post-Bid
$670,000 CJ est. value
Durango, CO 81303

Suit Sky Ute Fairgrounds Site improvements and Boat Storage Building
New Construction, Infrastructure
Post-Bid
$190,000 CJ est. value
Ignacio, CO 81137

Surface Treatment Project
Infrastructure
Results
$14,126,484 CJ est. value
Ignacio, CO 81137

Schneider Pickleball Project
Infrastructure
Results
$1,503,637 CJ est. value
Durango, CO 81301

Florida Road Townhomes
New Construction, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Durango, CO 81301

Gosney Storage Facility / Ignacio
New Construction, Infrastructure - 40,000 SF
Pending Verification
$4,300,000 CJ est. value
Ignacio, CO 81137

Purgatory Metro District Wastewater Treatment Facility
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Durango, CO 81301

Mercury Rising
New Construction, Infrastructure
Design
$27,200,000 CJ est. value
Durango, CO 81301

North College Drive Reconstruction Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Durango, CO 81301

Last Updated 07/24/2023 04:22 PM
Project Title

Wastewater Treatment Plant Project

Physical Address View project details and contacts
City, State (County) Durango, CO 81301   (La Plata County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The WORK includes the construction of a new 300,000 gallons per day advanced mechanical wastewater Treatment Plant at the Purgatory Ski Resort approximately 20 miles north of Durango, Colorado. The plant process will include a new headworks, primary equalization basin, Aqua Nereda secondary treatment process, secondary equalization basins, disk type tertiary filtration, UV disinfection, aerobic sludge digestion, sludge dewatering press, and side stream return flow treatment and storage. The treatment processes will be enclosed within a large single primarily concrete building that will also include administrative, service, and laboratory spaces. Critical treatment spaces will be enclosed, sealed, and provided with regulated air flow to capture all potential odors within an advanced HVAC and Odor Control process. The plant will be equipped with advanced instrumentation and controls systems to provide advanced process automation and control The owner has pre-purchased most of the main process equipment that will be provided to the selected Contractor as described within these specifications. The owner will also provide the project controls and instrumentation integrator to develop and implement the process control system. The selected contractor shall complete all civil construction including grading and drainage, site improvements, and will install and making functional the owner provided process equipment, including all piping, mechanical, electric, instrumentation and controls. The final product shall be a fully functional 300,000 gallon per day mechanical wastewater plant capable of the advanced treatment necessary to meet new nutrient limits as established by Colorado Department of Public Health and Environment. SITE OF WORK: The site of the WORK is located at 49786 Highway 550 North, Durango CO 81301, approximately 20-miles north of the City of the Durango. Completion of work: the work must be completed within 830 successive days after the Commencement date stated in the notice to proceed. BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of 120 calendar days from the date of bid opening Owner's rights reserved: the owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards to the lowest responsive, responsible bidder as it may best serve the interest of the owner.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents