Similar Projects
Gaffin Road SE Improvements - 0000253 - City of Salem
Infrastructure
Conception
$2,900,000 CJ est. value
Salem, OR 97317

Gaffin Road SE Improvements - 0000253 - City of Salem
Infrastructure
Conception
$2,900,000 CJ est. value
Salem, OR 97317

AutoZone #2227 / Salem
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Salem, OR 97317

AutoZone #2227 / Salem
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Salem, OR 97317

OR99E: Curb Ramps (Hubbard) Project on the Pacific Highway East (Route No. OR99E) in Hubbard
Infrastructure
Post-Bid
$300,000 est. value
Hubbard, OR 97032

Evans Haven
Infrastructure
Post-Bid
$1,935,000 CJ est. value
Gates, OR 97346

2022 Slurry Seal
Infrastructure
Results
Salem, OR

I-5 Deck Seals
Infrastructure
Results
Salem, OR 97301

The Confederated Tribes of Siletz Indians Casino
New Construction, Infrastructure - 673,300 SF
Pending Verification
$280,000,000 CJ est. value
Salem, OR 97305

Del Taco / Salem
New Construction, Infrastructure - 2,400 SF
Pending Verification
$400,000 CJ est. value
Salem, OR 97305

West Salem Wastewater Pump Station Improvements - 0001063 - City of Salem
Renovation, Infrastructure
Conception
$22,510,140 CJ est. value
Salem, OR 97301

Hilfiker Lane SE at Commercial Street SE Intersection with Signal Upgrade - City of Salem
Infrastructure
Design
$4,448,690 CJ est. value
Salem, OR 97302

Parking Lot Striping - 2022
Infrastructure
Post-Bid
$170,000 est. value
Salem, OR

Central Oregon Curb Ramps Phase 2
Infrastructure
Results
$6,623,000 CJ est. value
Salem, OR 97301

Four Corners Elementary School Expansion and Improvements - 2018 Bond - Salem Keizer Public Schools
Addition, Build-out, Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Salem, OR 97317

Last Updated 09/12/2023 12:18 PM
Project Title

Bus Stop Improvements Project - Group 5

Physical Address View project details and contacts
City, State (County) Salem, OR 97301   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SAMTD is seeking bidders to provide construction of approximately fifteen (15) bus stop location improvements involving bus stop and traffic management / control signs, concrete flatwork, minor restorative landscaping, and other work related to performing bus stop improvements and designed to remove accessibility barriers. The contractor shall furnish all materials and labor for the work on this construction project. Where noted on the drawings located in PART 2 of this solicitation, contractor shall install owner furnished shelters or reinstall existing shelters and contractor shall install owner furnished bus stop signs or reinstall existing bus stop signs. Requests for Question Deadline: August 23, 2023: 4:00PM PDT Notice To Proceed to successful contractor: October 1, 2023 (estimate) Substantial Completion: March 1, 2024 Final Completion: March 31, 2024 A Bid Bond must be issued by a fully qualified surety company acceptable to SAMTD and listed as a company currently authorized under 31 C.F.R. Part 223 as possessing a Certificate of Authority as described thereunder. The penal amount of the bid bond shall be ten (10) percent of the resulting contract price in accordance with ORS 279C.365, unless SAMTD determines that a lesser amount would be adequate for the protection of SAMTD. Bidder shall comply with, and require all of their subcontractors to comply with Federal, State, County, and City contractors licensing laws, and be duly registered and licensed thereunder. Bidder shall provide a performance bond and a labor and material payment bond, each in the amount of (100%) of the subcontract price unless otherwise noted in the individual bid package. SAMTD has an overall agency goal of 2.49 percent for the utilization of DBEs using race neutral means. SAMTD strongly encourages and expects Bidders to pursue subcontracting, mentoring, joint venturing, teaming, and partnering opportunities with DBE firms in the ordinary course of its business/teaming strategies. Bidders are encouraged and expected to create a level playing field to the maximum practical extent, consistent with the objectives and requirements of the SAMTD DBE Program, which is based on federal regulations codified at 49 CFR Part 26. The DBE participation goal applies to the total value of the contract including the results of all pre-award negotiations and post-award change orders/modifications. SAMTD reserves the right to reject any or all Bids, or part thereof, to accept one or more items of a Bid without obligation as to other items. SAMTD reserves the right to cancel this ITB / solicitation at any time without liability prior to execution of a contract by SAMTD if it is in SAMTDs or the publics best interest and is not liable for any costs the firm incurs while preparing or presenting the bid. All Bids will become part of the public file without obligation to SAMTD. SAMTD enforces the right to wave irregularities anytime through the solicitation process. AGENCY GOAL: 2.49%

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents