Similar Projects
22nd Street North East and B Avenue Intersection
Conception
$150,000 est. value
Cedar Rapids, IA 52402

9Th Avenue South East Improvements from 3rd Road Street to Railroad
Conception
$200,000 est. value
Cedar Rapids, IA 52407

Muscatine Municipal Airport
Infrastructure
Bidding
Muscatine, IA 52761

2022 Ashworth Road Pavement Patching
Infrastructure
Bidding
$200,000 est. value
Waukee, IA 50263

HMA Resurfacing
Infrastructure
Post-Bid
IA

County Road Improvements
Infrastructure
Post-Bid
IA

Clover Lane Overlay
Results
Asbury, IA

Edgewood Road NW from Ellis Road to Cedar River Bridge Pavement Rehabilitation
Results
$1,380,000 est. value
Cedar Rapids, IA 52407

Ingleside Drive South West Pavement Improvements
Conception
$250,000 est. value
Cedar Rapids, IA 52404

North Vine Street Paving
Infrastructure
Bidding
$65,135 est. value
West Union, IA 52175

Proposed Street Improvements - Middle Street and Prairie Street Paving
Infrastructure
Post-Bid
Mediapolis, IA 52637

8th Avenue South West from 15th Street South West to Rockford Road
Results
$3,220,000 est. value
Cedar Rapids, IA 52407

Phase 4 - Tower Terrace Road from C Avenue to W/o Barnsley Lane
Conception
$6,400,000 est. value
Cedar Rapids, IA 52407

U.S. 71 - PCC Pavement - Replace
Infrastructure
Post-Bid
IA

First Ave West Pavement Rehabilitation and Traffic Signals
Results
$2,470,000 est. value
Cedar Rapids, IA 52407

Last Updated 04/20/2022 03:30 PM
Project Title

2021 HMA Resurfacing

Physical Address View project details and contacts
City, State (County) Sheldon, IA   (O'Brien County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 11,387 SY of existing street HMA resurfacing to include, but not limited to: 1. Curb Stop Box Adjustments 2 .Valve Box Adjustments 3. Manhole Adjustments 4. HMA Overlay, 1M ESAL, 1/2’’ Mix, Surface Course, No Frict. 2.5” 5. HMA Overlay, 1M ESAL, 1/2’’ Mix, Surface Course, No Frict. 3.0” 6. Full Depth HMA Patches 7. Milling 8. Pavement Removal 9. Temporary Traffic Control 10. Painted Pavement Markings, Symbols and Legends 11. Flaggers Alternate 1: Curb and Gutter Replacement Alternate 2: Sidewalk and Driveway Replacement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents