Similar Projects
Last Updated | 03/28/2019 01:43 PM |
Project Title | Courthouse Roof - Mechanical |
Physical Address | View project details and contacts |
City, State (County) | Greenville, SC 29607 (Greenville County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Raise two (2) large air handling units and two (2) cooling towers, all piping will be reinsulated with new insulation and any valves removed will be replaced with new ones; duct work above the roof will be removed and replaced with new lined duct work and all associated electrical to be performed by the contractor. Greenville County will handle all associated BAS wiring. The two air handlers and two cooling towers will be raised two feet and set on permanent frame extensions. Current walk ways around the air handling units will be reconfigured so there are no supports touching the new roof. Contractor must provide a detailed sketch of how the two cooling towers and two air handlers will be raised up 24 inches. Contractor will test all four HVAC units after rising to ensure they work as designed. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |