Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Panera Bread / Roseville
New Construction, Infrastructure - 4,150 SF
Conception
$1,300,000 CJ est. value
Roseville, MN 55113

Silver Lake Road and I694 Intersection Improvement Project
Infrastructure
Design
$300,000 CJ est. value
New Brighton, MN 55112

Silver Lake Road and I694 Intersection Improvement Project
Infrastructure
Design
$300,000 CJ est. value
New Brighton, MN 55112

(MWWTP) Services Buildings and Site Improvements
Renovation, Infrastructure
Bidding
$35,000,000 CJ est. value
Saint Paul, MN 55101

Pool 2 Wing Dam Notching
Infrastructure
Bidding
$500,000 CJ est. value
Saint Paul, MN 55101

SPPS Jie Ming BP #4 Coiling Doors and Grilles
Renovation
Sub-Bidding
$100,000 CJ est. value
Saint Paul, MN 55116

SPPS Jie Ming BP 4 Carpet and Resilient Flooring
Renovation
Sub-Bidding
$200,000 CJ est. value
Saint Paul, MN 55116

AO Smith Btr500 120 Natural Gas Water Heater
Post-Bid
MN

Agricultural Lab Building Infrastructure Improvements
Renovation, Alteration
Post-Bid
$19,126,000 est. value
Saint Paul, MN 55155

2021 Water Main Clean and Line
Term Contract
Results
Saint Paul, MN

2021 Pipe Bursting
Results
Saint Paul, MN

Twin Lakes Station Demolition and Sitework
Demolition, Infrastructure
Construction
Roseville, MN 55113

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 WS 03A - Concrete
Renovation
Construction
$700,000 CJ est. value
Saint Paul, MN 55116

Lexington Avenue Commercial Buildings
Demolition, New Construction, Infrastructure - 24,780 SF
Pending Verification
$8,000,000 CJ est. value
Arden Hills, MN 55126

Last Updated 08/11/2022 04:33 PM
Project Title

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Earthwork, Utilities, Building Demolition

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55116   (Ramsey County)
Category(s) Education, Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Concrete, Site Development, Vocational School, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,086,550 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project No - 21269, 21005927.00, R21-4117.000 WS 31A - Jie Ming Earthwork, Utilities, Building Demolition. Deadline for contractor questions (in GetAll) 5/26/2022 2:00pm local time. Construction began on July 21, 2022 and is expected to be completed in 2024.

Details

20,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents