Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Construction Work Replace Sidewalks, Buildings 1-9 Elmira Psychiatric Center
Infrastructure
Bidding
$1,000,000 CJ est. value
Elmira, NY 14901

2022 Elmira High School North Athletic Field Improvements - General Trades Work
Renovation, Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Elmira, NY 14904

2022 EHS North Athletic Field Improvements - HVAC
Renovation, Infrastructure
Sub-Bidding
$280,000 CJ est. value
Elmira, NY 14904

Water System Improvement Project
Infrastructure
Post-Bid
Beaver Dams, NY

Horseheads Water System Improvements 2022
Infrastructure
Post-Bid
Horseheads, NY

Bridge Deck Overlays and Joint Repairs
Infrastructure
Results
$1,775,576 CJ est. value
Chemung, NY 14825

Elmira Stamping & Manufacturing Pavilion
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Elmira, NY 14904

Colonial Drive Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Horseheads, NY 14845

Reconstruct Echo Apron
Infrastructure
Bidding
$4,000,000 CJ est. value
Horseheads, NY 14845

Big Flats Elementary Addition and Alterations - Theatrical Work
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Big Flats, NY 14814

Provide Facility Closure Southport Correctional Facility - Construction Work
New Construction, Infrastructure
Post-Bid
$743,000 CJ est. value
Pine City, NY 14871

Elmira Corning Regional Airport Reconstruct Echo Apron
Infrastructure
Bidding
$200,000 CJ est. value
Horseheads, NY 14845

Horseheads Central School District Stadium Locker Room and Storage - General Trades Work
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Horseheads, NY 14845

Bethany Village Orchard Homes
New Construction, Infrastructure - 28,800 SF
Post-Bid
$7,672,000 CJ est. value
Horseheads, NY 14845

Last Updated 03/03/2023 11:03 PM
Project Title

Raw Water Main Pipe Lining

Physical Address View project details and contacts
City, State (County) Elmira, NY 14901   (Chemung County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $149,750 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

ELMIRA WATER BOARD 261 W. Water Street Elmira, New York 14901 Phone: 607-733-9179 PLEASE TAKE NOTICE: That sealed bids will be received by the Elmira Water Board, 261 W. Water Street, Elmira, NY 14901. The bid shall be in a sealed envelope marked with the title clearly identified on the outside of the envelope: Raw Water Main Pipe Lining Each bid must be made using the forms provided in the contract documents and shall be accompanied by a bank or certified check or a bid bond payable to the Elmira Water Board in the amount of 5% of the total bid as a guarantee that the bidder will enter into the contract if the project is awarded to the contractor. If upon acceptance of the bid, a bidder fails to enter into a contract with the Elmira Water Board, the bank or certified check or bid bond shall be forfeited to and become the property of the Elmira Water Board. Prevailing wage rates shall be as determined by the New York State Department of Labor PRC#: 2023000616. No bidder may withdraw their bid within 45 days after the bid opening. The successful bidder must furnish performance and payment bonds, each in an amount at least equal to the total bid, with a surety authorized to do business in the State of New York. Bidders are not to include in their bid, sales and compensating use taxes of the State of New York and of counties or cities on materials, equipment, and supplies to be incorporated into the project. The General Municipal Law of the State of New York requires that bidders certify, under penalty of perjury, that the bids have been prepared without collusion with other bidder subcontractors, suppliers, etc. The Elmira Water Board reserves the right to reject any or all bids offered. 1. Pre-Inspection and Pipe Cleaning of24" Cement Lined Ductile Iron Pipe. 2. Procure and install approximately 85 linear feet ofNSF approved 24" Cured-In-Place-Pipe (CIPP) Liner with NSF approved epoxy. 3. Epoxy and seal the end ofpipes to prevent water from entering space between existing pipe andm liner. 4. Post Video Inspection ofCIPP Liner.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents