Similar Projects
Munson Road Improvements - Phase VII
Infrastructure
Design
$458,000 CJ est. value
Orono, ME 04473

Munson Road Improvements - Phase VII
Infrastructure
Design
$458,000 CJ est. value
Orono, ME 04473

Broadway Pedestrian Safety Improvements Project
Infrastructure
Bidding
$155,000 CJ est. value
Bangor, ME 04401

Broadway Pedestrian Safety Improvements Project
Infrastructure
Bidding
$155,000 CJ est. value
Bangor, ME 04401

Repair Remaining Traffic Signals and Controllers
Infrastructure
Sub-Bidding
$203,983 CJ est. value
Bangor, ME 04401

Cleanup of the Administration Building
Term Contract, Infrastructure
Sub-Bidding
$450,000 CJ est. value
Millinocket, ME 04462

Pavement 2021 Project
Infrastructure
Post-Bid
Brewer, ME

Paving
Infrastructure
Post-Bid
Medway, ME 04460

Ohio Street Bridge Replacement/Located over 95 approximately 0.02 of a Mile South Easterly of Sixteenth Street
Results
Bangor, ME 04401

Willard C. Orr Bridge Replacement
Results
Bangor, ME

Large Culvert Replacement - Patten - Region 5
Infrastructure
Construction
$484,482 CJ est. value
Patten, ME 04765

Large Culvert Replacement - Patten - Region 5
Infrastructure
Construction
$484,482 CJ est. value
Patten, ME 04765

Nautilus Data Center / Millinocket
New Construction, Infrastructure
Pending Verification
$300,000,000 CJ est. value
Millinocket, ME 04462

Airport Improvement Program (AIP) Funded Runway Rehabilitation - City of Bangor
Infrastructure
Design
$3,000,000 CJ est. value
Bangor, ME 04401

Fire Truck Building Project at The Woodville Training Site (WTS)
New Construction, Infrastructure
Bidding
$1,382,500 CJ est. value
Woodville, ME 04457

Last Updated 08/05/2022 03:02 AM
Project Title

Boom Bridge Replacement - Greenbush - Region 4

Physical Address View project details and contacts
City, State (County) Old Town, ME 04468   (Penobscot County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $4,374,793 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The lowest responsive bidder must have completed, or successfully complete, a bridge prequalification or project specific prequalification to be considered for the award of this contract. Description: Maine Federal Aid Project No. 2309401 WIN 021727.01 Location: In Penobscot County, Boom bridge is located on U.S. Route 2/ Main Road over Boombridge Brook approximately 2.4 miles northerly of Milford town line. Scope of Work: Boom bridge replacement plus other incidental work. Outline of Work: Highway Safety Improvements and other incidental work. For general information regarding Bidding and Contracting procedures, contact George Macdougall at (207) 624-3410. For Project-specific information fax all questions to Project Manager Mike Wight at (207) 624-3431, use electronic RFI form or email questions to RFI- Contracts. MDOT@maine.gov, project name and identification number should be in the subject line. Questions received after 12:00 noon of Monday (or if that Monday is a state holiday, Friday) prior to bid date will not be answered. Bidders shall not contact any other Departmental staff for clarification of Contract provisions, and the Department will not be responsible for any interpretations so obtained. TTY users call Maine Relay 711. Each Bid must be made upon blank forms provided by the Department and must be accompanied by a bid bond at 5% of the bid amount or an official bank check, cashier's check, certified check, certificate of deposit, or United States postal money order in the amount of 5% of the bid amount, payable to Treasurer, State of Maine as a Bid guarantee. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each in the amount of 100 percent of the Contract price, will be required of the successful Bidder. This Contract is subject to all applicable Federal Iaws, This contract is subiect to compliance with the Disadvantaged Business Enterprise program requirements as set forth by the Maine Department of Transportation. The right is hereby reserved to the MaineDOT to reject any or all bids. MEDOT - Boom Bridge Replacement - Greenbush - Region 4 We now accept electronic bids for bid packages posted on the website. Electronic bids do not have to be accompanied by paper bids. Please note: The Department will accept a facsimile of the bid bond; however, the original bid bond must then be received at the MDOT Contract Section within 72 hours of the bid onening. Until further notice, dual bids (one naner, one electronic) will be accented, with the paper copy taking precedence.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents