Similar Projects
Correct Deficiencies Identified During Triennial Testing
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Saint Louis, MO 63125

DMS Sign Replacements, CCTV Cameras Replacement
Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Saint Louis, MO 63131

JC Penney Building Replace South Electrical Switch Gear
Alteration
Post-Bid
Less than $195,000 est. value
Saint Louis, MO 63121

Rab Lighting, High Bay Light Fixtures
Alteration
Post-Bid
Saint Louis, MO

Clinton Peabody Emergency Lighting Repairs
Alteration
Results
Saint Louis, MO 63104

Generator
Alteration
Results
Sappington, MO 63127

Electrical
Term Contract
Sub-Bidding
Des Peres, MO 63131

Electrical - On Call Maintenance and Repair Services
Term Contract
Post-Bid
Crestwood, MO

Interior Lighting Replacement at Ferguson Middle School
Alteration
Results
$200,000 est. value
Ferguson, MO 63135

Single Phase Polemount Dual Voltage Transformers
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Kirkwood, MO 63122

Facilities Maintenance Services
Infrastructure, Alteration
Post-Bid
Saint Louis, MO

Emergency Generators 50 and 80 Replacement
Alteration
Post-Bid
$250,000 est. value
Ferguson, MO 63145

Emergency Generator Maintenance Services
Alteration
Post-Bid
Ferguson, MO 63145

Conduct Tri-Annual Electrical Testing
Term Contract
Post-Bid
Bella Villa, Saint Louis, MO 63125

Single Phase Padmount Dual Voltage Transformers
Alteration
Post-Bid
MO

Last Updated 02/14/2023 06:40 AM
Project Title

Sign Installation

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63128   (Saint Louis County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $3,868,115 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J6I3481 Route I-255, I-270 ST LOUIS, ST LOUIS CITY County. Sign installation on I-255 from Mississippi River to I-55, and on I-270 from I-55 to Mississippi River, the total length of improvement being 39.2 miles. Range: 2.5M to 5M FEDERAL PROJECT NUMBER(S): I 270-5(366) Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of Missouri, acting by and Through the Missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - F01 - Sign Installation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 104.7.3.1 Preliminary Maintenance. Prior to the start of construction operations, the contractor shall notify the engineer of any preliminary pavement surface maintenance work that, in the opinion of the contractor, should be completed prior to the contractor assuming maintenance responsibility. The engineer will review such notice and respond with either concurrence or rejection of the request for preliminary maintenance work. If preliminary maintenance work is deemed necessary, the engineer will either arrange for the work to be done by others prior to the start of construction operations or will direct the contractor to perform the work prior to the start of construction operations. If the contractor is directed to perform the work, payment will be made per Sec 109.4.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents