Similar Projects
2021/22 Collector Street Pavement Improvements - Hoover Avenue - City of Ames
Infrastructure
Conception
$2,000,000 CJ est. value
Ames, IA 50010

Power Plant Building Office Entrance - City of Ames
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Ames, IA 50010

Lime Lagoon Improvements - City of Ames
New Construction, Infrastructure
Design
$1,353,000 CJ est. value
Ames, IA 50010

Cogeneration System Maintenance - City Of Ames
Renovation, Infrastructure
Design
$1,335,000 CJ est. value
Ames, IA 50010

2022/23 Downtown Street Pavement Improvements - Alley (5th Street-6th Street Between Duff Avenue to Douglas Avenue)
Infrastructure
Bidding
$133,510 CJ est. value
Ames, IA 50010

Bloomington Road Elevated Tank (BRET) Water Tower Valve Improvements
Infrastructure
Bidding
$20,000 CJ est. value
Ames, IA 50010

RFP - Ames Industrial Park Development
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Ames, IA 50010

Test Drilling at North River Valley
Infrastructure
Post-Bid
$50,000 est. value
Ames, IA

Ames Surgery Center - Bid Packages (01 - 11)
New Construction, Infrastructure - 31,362 SF
Results
$17,845,556 CJ est. value
Ames, IA 50010

Southeast Recreation Complex-Pavilion
New Construction, Infrastructure
Results
$249,200 CJ est. value
Ames, IA 50010

North Dayton Industrial Park
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Ames, IA 50010

2021/22 Storm Water Facility Rehabilitation - City of Ames
Infrastructure
Conception
$150,000 CJ est. value
Ames, IA 50010

Unit 8 Superheat Replacement - City of Ames
Renovation, Infrastructure
Design
$6,550,000 CJ est. value
Ames, IA 50010

Story County Conservation Sopers Mill River Water Access
Infrastructure
Bidding
$800,000 CJ est. value
Ames, IA 50010

Electric Services Department Public Improvement Project
Infrastructure
Post-Bid
$225,000 CJ est. value
Ames, IA 50010

Last Updated 01/02/2023 10:31 AM
Project Title

McFarland Park Lake Restoration - County of Story

Physical Address View project details and contacts
City, State (County) Ames, IA 50010   (Story County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $932,779 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include removal and disposal of lakebed sediment, lakebed grading, shoreline grading, forebay construction, pipe installation, rock installation, and seeding. The work must commence within 60 days of the date of the Notice to Proceed. Tree clearing work must be complete by March 31, 2023. Work must be substantially complete by December 1st, 2023. Each Bidder shall accompany the Bid with a Bid security, in a separate envelope, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of the contract corporate surety bond or bonds, acceptable to the Owner, for the faithful performance of the contract, in an amount equivalent to one hundred percent of the amount of the contract. The bidder's security shall be in an amount equivalent to 5% of the bid amount, and shall be in the form of a cashier's or certified check drawn on a bank in Iowa or a bank chartered under the laws of the United States of America, or a certified bank share draft drawn on a credit union in Iowa or chartered under the laws of the United States of America or a bid bond with corporate surety satisfactory to the Owner. The bid security will be held by the Owner until a contract is fully executed and bonds are approved by the Owner. All Bidders are required to provide a statement regarding their residency status as required by 875 Iowa Administrative Code Chapter 156. Contractors using "materials, supplies, and equipment" on projects in designated "exempt entities" may purchase these items without liability for the sales tax. The contractor must have a purchasing agent authorization letter and an exemption certificate from the public entity to present to the retailer, which specifies the construction project and will be available for that project only. Owner will issue an authorization letter and an exemption certificate to the contractor and/or subcontractors for the purchase or use of building materials, supplies, and equipment to be used on this project only. DO NOT include sales tax on your bid form. No bid may be withdrawn for a period of 30 days after the date of the scheduled closing time for the receipt of bids. Bidders shall be prepared to submit a performance bond and payment bond conditioned on the faithful performance of the contract. Out-of-state bidders shall be prepared to submit an Out-of-State Contractor Bond to the Iowa Division of Labor in accordance with Chapter 91C of the Code of Iowa. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. It is the intent of the Owner to award a contract to the lowest responsible, responsive bidder provided the bid has been submitted in accordance with the bidding requirements. The Owner reserves the right to waive informalities or irregularities. The Owner reserves the right to reject any or all bids.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents