Similar Projects
Boiler Plant Upgrades
Renovation, Alteration
Design
$100,000 to $250,000 est. value
Bath, NY 14810

2022/2023 Chemical Water Treatment (Boiler)
Alteration
Bidding
NY

State Phase II B Boiler Replacement at Marcy Houses
Alteration
Bidding
$700,000 est. value
New York, NY

Phase 1B - Building Improvements Contract 12 - Columbus School - Mechanical Construction - Part 1
Alteration
Sub-Bidding
$250,000 est. value
Poughkeepsie, NY 12601

Contract No. MC-05 - Mechanical Work @ NRHS Utilities Building - Sub
Alteration
Sub-Bidding
$200,000 est. value
New Rochelle, NY 10801

Water Treatment Chemicals
Post-Bid
Newburgh, NY

2017 Capital Improvement Project Phase 2B - Mechanical
Post-Bid
Fallsburg, NY 12733

Lansing CSD - Reconstruction to Senior High School - Mechanical
Results
Less than $80,000 est. value
Lansing, NY 14882

Centrifuge Maintenance and Repair Services
Term Contract
Results
Orangeburg, NY 10962

Boiler Repair and Maintenance
Alteration
Bidding
New York, NY

J045--High Pressure Boiler Plant Safety Device Testing, Tuning & Calibrations and Summer Maintenance High Pressure Boilers & Boiler Plant Equipment
Post-Bid
Castle Point, Montrose, NY 10548

NGN Mechanical Upgrades
Term Contract
Results
Lewiston, NY

Preventive Maintenance, Performing Inspections and/or Testing of the Equipment, Troubleshooting, Repair, Clean and Tune-up Boilers
Alteration
Bidding
New York, NY

Preventive Maintenance of Building Management System and Ancillary Equipment
Post-Bid
West Seneca, NY 14224

Replacement of Two Boilers at the Millwood Water Treatment Plant
Results
Chappaqua, NY 10514

Reported 05/13/2022 12:00 AM
Project Title

Guterman Bioclimatic Lab Hot Water Conversion

Physical Address View project details and contacts
City, State (County) Ithaca, NY 14850   (Tompkins County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Bids by Invitation.
Project Status Bidding, Construction Completion Expected September 2022
Bids Due View project details and contacts
Estimated Value $550,000 to $575,000
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

1. Replace vertical unit heaters in greenhouse spaces. 2. Install additional finned tube radiators in select greenhouse spaces. 3. Install new unit heaters in Rice Greenhouse and replacement of circulator pump. 4. Remove four way mixing valve at southeast greenhouse and replacement with three way mixing valve. 5. Remove and replace hot water coils in AC-1 and AC-2. 6. Install a glycol heating loop to service AC-1, AC-2 including pumps, air separator, expansion tank and glycol make up unit.Total sq ft for project not available at this time.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents