Similar Projects
Summer 2021 Paving / Reclamation Projects
Infrastructure
Post-Bid
White River Junction, VT

Route 35 Improvements Phase 3
Results
$206,245 est. value
Chester, VT 05143

South Main Street Utility and Roadway Improvements Project
Results
$2,560,000 est. value
Hartford, VT

Statewide STP Crak (40)
Results
$500,000 to $1,000,000 est. value

Statewide STP Crak (39)
Results
$500,000 to $1,000,000 est. value

2020 Crack Sealing
Results
Sharon, VT

Pleasant and Terrace Street Roadway Rehabilitation and Elm, Crystal and Hall Street Complete Roadway and Utility Reconstruction Project
Results
Windsor, VT

Summer 2020 Paving / Reclamation Project
Results
Hartford, VT

Norwich-Thetford STP FPAV (30)
Results
$2,500,000 to $5,000,000 est. value
Norwich, Thetford, VT 05074

Chester Bf 0134 (50)
Results
$500,000 to $1,000,000 est. value
Chester, VT

Chester-Springfield Stp 2942 (1) and Chester-Springfield Stp Ps19 (4) and Springfield Stp Ps19 (5)
Results
$5,000,000 to $10,000,000 est. value
Chester, Springfield, VT 05156

Hartford-Sharon IM Surf (65) and Hartford-Sharon IM Surf (66)
Results
$5,000,000 to $10,000,000 est. value
Hartford, Sharon, VT

Hartford STP PC21 (4) and Woodstock NH PC21 (5) and Woodstock STP PC21 (3)
Results
$5,000,000 to $10,000,000 est. value
Hartford, Woodstock, VT

Hartland-Norwich IM 091-1 (84)
Results
$5,000,000 to $10,000,000 est. value
Hartland, Norwich, VT

Retainer Contracts for Asphalt Paving, Sealing & Striping Services Statewide
Term Contract
Results
$500,000 est. value

Last Updated 09/07/2021 04:50 PM
Project Title

BGS - ANR FPR Coolidge State Park - Park Road Improvements

Physical Address View project details and contacts
City, State (County) Plymouth, VT 05035   (Windsor County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include improvements to approximately 1.7 miles of the existing park road completed along a lower and upper segment of the roadway. Work will be completed along 4,500 feet of lower park bituminous roadway with resurfacing by milling & re-paving. Following tree removal work along the roadside, the upper park roadway bituminous surface, and trail head parking area will be reclaimed for re-use to establish, with make-up aggregate, a finished gravel roadway / parking surface. Construction of an ADA compliant parking space and access aisle with bituminous surface will also be included with the upper park road improvements, as will improvements to side road drainage ditches. Common to both upper and lower roadway work will include improvements or replacement and repair of roadway culvert crossings with re-set or replacement of associated stone headwalls, and perimeter barrier fencing system improvements at common areas. Completion of other associated work to complete the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents