Similar Projects
The Crossing
New Construction
Design
Saratoga Springs, UT 84045

General Contractor Prequalification - Heritage Park 10 MG Water Tank Project
Infrastructure
Bidding
Orem, UT

Park 1,4,10 Wards Parking
New Construction
Post-Bid
Orem, UT 84058

Harvest View Park Phase 2 - Site Construction
Renovation
Post-Bid
Santaquin, UT

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Ridge At Alpine Phase 1
New Construction
Construction
Alpine, UT 84004

American Fork Multifamily - Offsite Work
New Construction
Construction
American Fork, UT 84003

Fast Gas Parking Lot
New Construction
Pending Verification
Spanish Fork, UT

Northshore Neighborhood
New Construction
Pending Verification
Saratoga Springs, UT

Santaquin Zone 11W Tank and Booster Pump CM/GC
New Construction
Post-Bid
Santaquin, UT 84655

Construction Services for Sand Pit and 600 East Culinary Water Tanks
Results
Less than $342,244 est. value
Lehi, UT 84043

North Shore Terminal Reservoir Phase 2 Expansion Project
Renovation
Construction
Orem, UT

Vineyard 6 MG Tank and Booster Pump Station Project
New Construction, Infrastructure
Post-Bid
Vineyard, UT

Power Department Building
Results
Salem, UT 84653

Reported 01/06/2022 12:00 AM
Project Title

Vineyard Tank Material Removal and Site Grading

Physical Address View project details and contacts
City, State (County) Vineyard, UT 84059   (Utah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 12/27/21
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors to grub vegetative areas, remove surcharge material, and grade and compact the worksite for the upcoming Water Tank Project. The project is generally described as follows: 1. Grub vegetated areas and invasive trees, remove approximately 28,000 cubic yards of surcharge materials, grade and compact approximately 7,000 cubic yards of the material on site per grading plan, and haul and stockpile the remainder of the materials to a site within Vineyard approximately one mile away.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents