Similar Projects
Renovations and Additions to Horace Mann Hall
Renovation, Addition, Demolition - 10,500 SF
Construction
Less than $18,000,000 est. value
Providence, RI 02908

Ranger Hall Renovations Phase 2
Renovation - 10,166 SF
Results
South Kingstown, RI 02881

Rhode Island Nurses Institute Middle College
Design
$500,000 est. value
Providence, RI 02900

Ryan Institute Lab Renovation - Phase 1
Renovation
Results
South Kingstown, RI 02881

Ryan Institute Lab Renovations - Phase 2
Renovation
Results
$2,068,000 est. value
Kingston, RI 02881

Owner`s Program Manager - Clarke Science Renovations at Rhode Island College
Renovation
Results
$38,000,000 est. value
Providence, RI

PCM - Phase 1 - Clarke Science Renovations at Rhode Island College
Renovation
Results
North Providence, RI 02908

Bathroom Renovations CCRI Knight Campus
Renovation
Post-Bid
Warwick, RI 02886

Carothers Library Bathroom Renovations
Renovation
Post-Bid
South Kingstown, RI 02881

Roosevelt Hall Bathroom Renovations
Renovation
Post-Bid
South Kingstown, RI 02881

Clarke Science Renovations At Rhode Island College Phase II
Renovation
Results
Providence, RI

Soloviev Practice Facility Renovations
Renovation
Bidding
$30,000 est. value
South Kingstown, RI

Last Updated 04/22/2022 02:01 PM
Project Title

Design-Bid-Build, Repair B3 Mahan Hall, Naval War College

Physical Address View project details and contacts
City, State (County) Newport, RI 02841   (Newport County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced fourth quarter 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid construction work includes: All interior Hazard Materials abatement and disposal work all floors, All interior demolition and new work layout plan revisions, including new egress corridors in stack area, All interior finishes, for new work and repair work, All interior woodwork/casework/wood trim finishes for new work and repair work, All interior structural work noted for existing 1964 stack area- columns and stack work, All demolition mechanical work, All new work general mechanical scope, including all TABS, Controls work, and Acceptance, All demolition work noted for electrical, including lighting, conduit/wire, electric panels, Al new work noted for electrical – lighting, including exterior lighting, lighting controls, including exterior lighting controls, General Branch - new wiring in existing conduit, General Branch – new wiring in new conduit, General Branch – new wiremold /new wire lighting, power distribution, power to electrical and mechanical equipment, All new work noted for fire suppression system, including testing/Government acceptance, new fire suppression line to building, Fire Detection & Alarm Systems, electronic safety and security, and All work noted for existing furniture relocation within 10 miles. - Option 1 construction work includes: All new work for exterior repairs - masonry repointing, & all granite repair/replacement, flashing repairs/replacement, masonry repairs/replacement and other Misc. Repairs; excluding exterior facade cleaning , All interior Hazard Materials abatement and disposal work for new work layout plan revisions for toilet rooms, All interior demolition and new work layout plan revisions, and interior finishes for new toilet rooms, All interior door replacement and door hardware replacement, All demolition plumbing work, including all exterior work as required to support plumbing scope, All new work for plumbing - Water Distribution, piping and insulation, sanitary sewer, water heaters, equipment, and fixtures, gas piping and testing, All new work for electrical – emergency power, All demolition and new work noted for telecommunications, All demolition and new work noted for site/civil work, including ledge work, for new elevator addition, new drainage, and new utilities, All work noted for the construction of new elevator shaft: including existing building demolition, structural shoring/strengthening of existing building, construction of new elevator shaft and override, elevator cab and associated structure/fitting/equipment, elevator machine room equipment, and all required elevator testing and Government acceptance, All work noted for new mechanical, electrical – power and lighting, life safety, plumbing at new addition, including all testing and acceptance, TABS, Controls work, and Government acceptance, All new work noted for construction of new connector addition, including interior finishes. - Option 2 construction work includes: All demolition and new work for replacement flat roofs and replace roof railings, All demolition and new work for repair and replacement windows, All new work for mechanical shade at Reading Room, All new work to refinish decorative scagliola at columns and fireplaces, All new work for electrical item - poke-thru devices, Power Distribution Add Alternate, All new work for electrical/life safety - mass notification, All new work for repairs to existing skylights, All new work for exterior masonry facade cleaning

Details

,, 28,480 SF - 1 College/University, 27,980 SF Renovation, 1 College/University, Approximately 500 SF Addition.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Automatic Entrances, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents