Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Install Rock Slope Protection and Roadway Excavation
Infrastructure
Bidding
$1,410,000 est. value
CA

Culvert Contact Grouting, Concrete Invert Paving and Misc. Iron and Steel
Infrastructure
Bidding
$770,000 est. value
CA

Citywide Flood Protection Maintenance
Infrastructure
Post-Bid
Paso Robles, CA

Repair Failing Slope
Infrastructure
Post-Bid
$275,400 est. value
CA

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Riverside Levees Pl 84-99 Rehabilitation Project
Renovation, Infrastructure
Design
$25,000,000 to $100,000,000 est. value
Riverside, CA

Replace Culverts
Infrastructure
Bidding
$340,000 est. value
CA

Roadway Excavation, Place HMA (Type A), and Alternative Pipe Culvert
Infrastructure
Post-Bid
$76,000,000 est. value
Olancha, CA

Compost Leachate Pond Improvements
Renovation
Results
$1,900,000 est. value
Auburn, CA 95603

Place Pipeliner and Repair Culverts
Infrastructure
Bidding
$420,000 est. value
CA

Seventh Avenue Arrowhead Drive Road Improvement
Alteration
Post-Bid
Victorville, CA

County Roadway Drainage Improvement Project
Infrastructure
Results
CA

Reported 02/20/2022 12:00 AM
Project Title

Industry Day - American River Common Features 2016, Sacramento River East Levee (SREL), Contract 4

Physical Address View project details and contacts
City, State (County) Sacramento, CA   (Fresno County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Levee raise or flood wall construction in constricted area (Stations 1032+50 to 1033+00, for example) Use of Secant Pile or Jet Grout cutoff wall construction methods at Westin/Scott’s Seafood (Stations 1243+75 to 1245+04). This is a historic levee breach location and the levee foundation includes large diameter debris (potentially 2+ feet in diameter). Staging area sizing and locations Schedule The levee degrade and reconstruction need to be completed outside of the flood season between 15APR23 – 31OCT23, with all cutoff wall completed and levee reconstructed not later than 30SEP2023. Availability of Material/Equipment Identification of any material and/or equipment that may be limited/scarce/have high demand Borrow/Disposal Sites Maximize competition and ensure approval to include all NEPA/CEQA/Section 106 clearance prior to 15APR23 Possibility to use excavated riverbank material from USACE levee erosion protection project on north bank of American River around H street bridge as a borrow site.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents