Similar Projects
Reported | 02/20/2022 12:00 AM |
Project Title | Industry Day - American River Common Features 2016, Sacramento River East Levee (SREL), Contract 4 |
Physical Address | View project details and contacts |
City, State (County) | Sacramento, CA (Fresno County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction Levee raise or flood wall construction in constricted area (Stations 1032+50 to 1033+00, for example) Use of Secant Pile or Jet Grout cutoff wall construction methods at Westin/Scott’s Seafood (Stations 1243+75 to 1245+04). This is a historic levee breach location and the levee foundation includes large diameter debris (potentially 2+ feet in diameter). Staging area sizing and locations Schedule The levee degrade and reconstruction need to be completed outside of the flood season between 15APR23 – 31OCT23, with all cutoff wall completed and levee reconstructed not later than 30SEP2023. Availability of Material/Equipment Identification of any material and/or equipment that may be limited/scarce/have high demand Borrow/Disposal Sites Maximize competition and ensure approval to include all NEPA/CEQA/Section 106 clearance prior to 15APR23 Possibility to use excavated riverbank material from USACE levee erosion protection project on north bank of American River around H street bridge as a borrow site. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |