Similar Projects
Contractor - Repair HVAC System, Alert Facility B248
Alteration
Design
$1,000,000 to $5,000,000 est. value
North Charleston, SC

HVAC and Mechanical Products
Term Contract
Post-Bid

MRD Water Treatment Maintenance
Post-Bid
Charleston, SC 29412

Repair HVAC Dormitory Building 2405 and 2406
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

Chiller Replacement at Lightsey Center
Results
Charleston, SC 29401

HVAC Contractors
Term Contract
Post-Bid

HVAC Equipment
Results
North Charleston, SC 29406

Materials For Weatherization Assistance Program
Term Contract
Post-Bid

Daniel Library HVAC Replacement Phase 2 - Central Air Conditioning
Results
$1,500,000 to $2,000,000 est. value
Charleston, SC 29409

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Filbin Creek and Noisette Ventilation Upgrades
Results
North Charleston, SC 29405

Heat Pump System 7.5 ton Charleston SC
Term Contract
Post-Bid
$25,000 to $100,000 est. value
Charleston, SC 29412

HVAC and Filter Maintenance
Term Contract
Results
Charleston, SC

Variable Frequency Drives for Existing Air Handler-Charleston, SC
Term Contract
Post-Bid
SC 29414

Arco Lane Warehouse Chiller Replacement
Alteration
Results
$150,000 to $175,000 est. value
North Charleston, SC 29418

Last Updated 07/26/2022 02:11 PM
Project Title

Kelly House 312 and 215 Remove and Replace Ducting

Physical Address View project details and contacts
City, State (County) Charleston, SC 29424   (Charleston County)
Category(s) Residential, Single Trades
Sub-Category(s) Dormitory, HVAC
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

College of Charleston needs to hire a contractor to remove and replace HVAC ducting at Kelly House room number's 312 and 215. Deadline to Submit Written Questions July 21, 2022 at 10:00 AM Contactor shall provide labor and materials to remove and replace the HVAC ducting that serves rooms 312 and 215 at Kelly House Dorm located at 106 St Philip St, Charleston, SC 29424. All work shall be performed during normal business hours which are Monday to Friday 7:00 am - 3:00 pm. All work must be completed by August 10, 2022. Contractor shall provide the following: 1. Remove and dispose of the existing fiberboard ducting from the unit up to the wall boots. 2. Install a new sheet metal trunk line and insulate with R-8.3 duct wrap. 3. Install flex duct from the new trunk line to each existing boot. 4. Provide necessary hanging hardware. 5. Tape and seal each duct seam and connection point. 6. Install new supply registers on each existing boot. 7. Return the system to normal operation. 8. Clean work place daily and final clean. Sheetrock removal and replace will be performed by another contractor. Floorplans for Kelly House 2 nd and 3 rd floor are provided below.

Details

2 Stories Above Grade.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents