Similar Projects
SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

Dirt Road Paving - Joseph Griggs Road - Barrow County
Infrastructure
Conception
$300,000 CJ est. value
Winder, GA 30680

Barber Creek Water Reclamation Facility (WRF) System Upgrades - Phase 2 - Construction - Barrow County
Renovation
Design
$5,173,231 CJ est. value
Winder, GA 30680

Murphy Oil #6766/7897 / Winder
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$2,000,000 CJ est. value
Winder, GA 30680

Raw Water Storage Pond Piping
Infrastructure
Bidding
$9,000,000 CJ est. value
Auburn, GA 30011

Construction of a Roundabout on SR 11
Infrastructure
Post-Bid
$4,744,744 CJ est. value
Winder, GA 30680

RFP D/B - Fire Station No. 3 New Construction
New Construction, Infrastructure
Post-Bid
$98,300 CJ est. value
Winder, GA 30680

2022 Additional Paving
Infrastructure
Results
$902,940 CJ est. value
Winder, GA 30680

Corporate Hangar Taxiway project
Infrastructure
Results
$4,247,203 CJ est. value
Winder, GA 30680

Bethlehem Christian Academy Gym and Classroom
Addition, Demolition, Renovation, Infrastructure
Construction
$1,800,000 CJ est. value
Bethlehem, GA 30620

Accent Springs
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Bethlehem, GA 30620

Carl-Bethlehem Road Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$165,000,000 CJ est. value
Winder, GA 30680

Water Line Replacement - Double Bridges Road At Bowman Mill - Barrow County
Infrastructure
Conception
$1,500,000 CJ est. value
Winder, GA 30680

MUNI - Dev Plan - GC DWR (Gwinnett Eastern Regional Infrastructure Project Trail) - Crowder Construction Co
Infrastructure
Design
$2,000,000 CJ est. value
Bethlehem, GA 30620

RFQ D/B - Architectural and/or Design-Build Services - New Construction of Single-Family Housing
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Winder, GA 30680

Last Updated 09/28/2023 10:05 AM
Project Title

Hwy 53 Water Treatment Plant Expansion

Physical Address View project details and contacts
City, State (County) Winder, GA 30680   (Barrow County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $18,537,600 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 14, 2023, this project has not yet been awarded. Award should be going before the city council later this month. The OWNER will evaluate all bids received and award the contract based on bid price and qualifications. The CONTRACTOR selected will be notified in writing by the OWNER. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) calendar days. Work To Be Done: The Work to be completed for the HWY 53 WATER TREATMENT PLANT EXPANSION is described briefly as follows: In general, construction shall consist of modifying the flow control vault and pre-flash mixer, constructing a new hydraulic flocculator, installing plate settler and sludge collection systems, rehabilitating the filters, constructing a new bulk chemical storage facility and chemical feed improvements, a new backup generator, and other miscellaneous piping, instrumentation, and electrical work. Please contact QuestCDN customer support at 952-233-1632 or info@questcdn.com for assistance in membership registration, downloading and working with digital project information. Any other questions can be directed to the issuing office, ESG Engineering, Inc. Margaret Hildebrand mhildebrand@esgengineering.com or 478-474-4996 ext. 239. Contractor License: Any Contractor submitting a bid must be licensed by the State of Georgia. See Instructions to Bidders for additional bidding requirements Funding: This project is funded by the GEFA Clean Water SRF Program requiring compliance with applicable state and federal bid laws. Reservation of Rights: Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. ESG Engineering Inc. City of Winder Utilities Hwy 42 Water Treatment Plant Expansion (JN21, 28, JU5, 12, 19, 26 B/2725 B/2725) The deadline for questions to 5:00 P.M. on August 3rd, 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents