Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Heating Unit, Water Heater, Window Air Conditioner Install, Bathroom Stool Replacement
Term Contract
Results
IA

Building S-38 Vehicle Exhaust Upgrades
Alteration
Results
Johnston, IA

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

Building S-34 Vehicle and Welding Exhaust Upgrades
Alteration
Results
Johnston, IA

Valley High School Pool Remote Terminal Units (RTU) Replacement
Alteration
Post-Bid
$500,000 est. value
West Des Moines, IA 50266

Skywalk HVAC Replacement Phase 4
Alteration
Results
Less than $150,000 est. value
Des Moines, IA

HVAC Repair Services for IPTV Transmitter Sites
Alteration
Post-Bid
Des Moines, IA

East Side and South Side Library HVAC Improvements
Alteration
Results
$625,000 est. value
Des Moines, IA 50317

Lucas Building Air Handling Unit Modifications to the M1 and M2 AHUs
Alteration
Post-Bid
$800,000 est. value
Des Moines, IA 50319

9th and Locust Street Parking Garage Skywalk and HVAC Improvements
Renovation, Alteration
Results
$850,000 est. value
Des Moines, IA 50982

Hubbell - Callanan - HVAC
Alteration
Results
Des Moines, IA 50312

DMPS Brody - Goodrell - Stowe - HVAC Upgrades
Alteration
Results
Des Moines, IA

Capitol View and Madison HVAC Upgrades
Alteration
Results
Des Moines, IA 50316

Last Updated 07/18/2022 11:20 PM
Project Title

Install a New Mini Split HVAC System for the Altoona Maintenance Garage Break Room

Physical Address View project details and contacts
City, State (County) Altoona, IA 50009   (Polk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC Contractor to provide and install a Mini Split Heating and Cooling system for 2nd floor breakroom at the Altoona DOT Maintenance Garage.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents