Similar Projects
Magistrate Judge Chambers Refresh, Fargo
Renovation
Bidding
$100,000 CJ est. value
Fargo, ND 58102

RFQ - Architectural and Engineering Multiple Award IDIQ New England
Term Contract
Bidding
New England, ND 58647

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

New Billets Building 2040
New Construction
Results
$5,000,000 est. value
Devils Lake, ND

HVAC, VFD, and Control Upgrades Fargo AFRC and FMS No. 2
Renovation
Results
$516,832 CJ est. value
Fargo, ND 58102

RFQ Contractor - USP 795 797 800 Belcourt Pharmacy Renovation & Expansion
Addition, Demolition, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Belcourt, ND 58316

Building Improvements - Building 5800
Renovation
Post-Bid
$200,000 CJ est. value
Devils Lake, ND 58301

HVAC, VFD, and Control Upgrades Readiness Center Building 1501 and FMS No.3
Renovation
Results
$393,990 CJ est. value
Grand Forks, ND 58201

HVAC, VFD and Control Upgrades Buildings 4100, 4200, RJB Complex
Renovation
Post-Bid
$500,000 CJ est. value
Bismarck, ND 58501

Air Handler and Geothermal System Improvements
Renovation
Results
$995,000 CJ est. value
Devils Lake, ND 58301

Radiation Portal Monitor (RPM) Installation
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Pembina, ND 58271

North Dakota National Guard Readiness Center
New Construction, Infrastructure
Results
$2,623,272 CJ est. value
Dickinson, ND 58601

Concrete and Asphalt Repairs Armed Forces Reserve Center (AFRC) and Field Maintenance Shop (FMS) 1
Infrastructure, Renovation
Post-Bid
$500,000 CJ est. value
Minot, ND 58703

Johnny Bird Memorial Building Office Fit-Up
Renovation
Post-Bid
$100,000 CJ est. value
New Town, ND 58763

Last Updated 10/05/2023 06:05 AM
Project Title

Construct Emergency Power Plant Fuel Storage, Cavalier Space Force Station (SFS)

Physical Address View project details and contacts
City, State (County) Cavalier AFS, ND 58220   (Pembina County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from Agency's Affiliate - 10/18/23
Owner View project details and contacts
Architect View project details and contacts
Description

Construct Emergency Power Plant Fuel Storage, Cavalier Air Force Station (AFS) ASN Site #1, North Dakota (ND) On or about 18 October 2023, this office will issue solicitation with Request for Proposal (RFP) for Construction of the Emergency Power Plant Fuel Storage at Cavalier AFS ASN Site #1, ND. This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. The acquisition approach for this project will be a Best Value Tradeoff RFP following FAR Part 15 procedures. All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS code 236220 is included in their profile prior to submission of offer. Site Visit: The site visit information will be included within the solicitation. DO NOT submit requests for plans and specifications. See 'Obtaining Solicitation Documents' below. Project Description (approx. quantities): This project will construct 360,000-gallon fuel storage farm to operate emergency power plant for the Perimeter Acquisition Radar Attack Characterization System (PARCS). Project includes utility infrastructure, exterior communications, and site preparation. This project will comply with DoD antiterrorism/force protection requirements per Unified Facilities Criteria. The project will comply with all applicable DoD, Air Force, and base design standards. The Contractor must design facilities as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, "General Building Requirements" and UFC 1-200-02, "High Performance and Sustainable Building Requirements." The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work within the proposed number of calendar days (Not to Exceed 540 days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the allowed time. Performance and Payment Bonds will be required. The above project description is for information only. Project scope of work is subject to change. RFP Evaluation Criteria: Firms participating in the solicitation will submit technical requirements in accordance with Section 00 22 00 EVALUATION CRITERIA. Submissions will be evaluated based on a best value approach considering technical elements for evaluation (i.e., Past Performance, Technical Approach, Key Personnel, and Contract Schedule). An adjectival method of evaluation will be used to evaluate all technical factors. Price will be evaluated separately for reasonableness and realism. A Best Value selection will be considered after reviewing price and technical factors. The estimated construction cost of this project is between $25,000,000 and $100,000,000. Contracting Office Address: USACE Omaha District 1616 Capital Ave Omaha, NE 68102-4901 Point Of Contact: All questions shall be submitted on ProjNet (ProjNet access, and additional guidance, will be given at time of solicitation issuance). Place of Performance: Cavalier AFS, ND Obtaining Solicitation Documents: Solicitation documents will be posted to the web via SAM.gov (https://sam.gov). Find solicitation announcement in SAM.gov (https://sam.gov). Use the "Keywords" search function to locate the project (by entering the solicitation number) or use the advanced search features offered in the "Federal Organizations" (towards the middle of the page) or use the "Federal Organizations" search feature followed by the "Advanced Search" feature. By using the "Sign In" feature, it allows additional search features and allows you to keep your searches. Sign In might be required on some solicitations that are considered restricted. Once you have located your project, click on hyperlinked title of the solicitation to view the project. Files may be downloaded from the "Attachments/Links" section of the solicitation. Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (https://sam.gov). Registration is required to access solicitation documents. SAM.gov (https://sam.gov) provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments. Please direct procurement questions to the Contracting Specialist, Scott Dwyer via email at Scott.Dwyer@usace.army.mil, add the Solicitation Number and Name in the Subject Line of the email. PHONE CALLS WILL NOT BE ACCEPTED. DATES ARE ESTIMATES AND SUBJECT TO CHANGE. The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents