Similar Projects
Dusenbury and Engineer Lake Embankment Dam Road Repairs
Infrastructure
Bidding
$5,000,000 CJ est. value
Fort Polk, LA 71459

Dusenbury and Engineer Lake Embankment Dam Road Repairs
Infrastructure
Bidding
$5,000,000 CJ est. value
Fort Polk, LA 71459

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

LA 465: LA 8 - LA 28
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
LA

La 489: Fort Polk to La 121
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
LA

Information Systems Facility (ISF), Fort Polk, LA
Demolition, New Construction, Infrastructure - 28,300 SF
Bidding
$28,494,421 CJ est. value
Fort Polk, LA 71459

Asphalt Grinding
Term Contract
Post-Bid
Leesville, LA

Dr 4263 Pw 910 Paved Roads - Task Order No. 4
Infrastructure
Results
$4,500,000 est. value

2 Asphalt Overlay (Level 1 Non-Polymer)
Infrastructure
Post-Bid
Leesville, LA

LA 392 Bridges Near Hornbeck
New Construction, Infrastructure
Results
$2,500,000 to $5,000,000 est. value
LA

Chip Seal
Infrastructure
Post-Bid
Leesville, LA

Alta Road Bridge Replacement Project
Renovation
Results
$716,404 est. value

Asphalt Road Leveling (Level 1 Non-Polymer)
Infrastructure
Post-Bid
Leesville, LA

2022 District 12, 13, 14 Road Improvements
Infrastructure
Results
$1,366,416 est. value

Last Updated 08/26/2022 04:32 AM
Project Title

Holton Harris Road Bridge

Physical Address View project details and contacts
City, State (County) Anacoco, LA 71403   (Vernon County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Type Improvement : Bridge Replacement - No Realignment Length 0.12 miles) Parish : Vernon Estimated Cost Range $500,000 to $1,000,000 As of August 26, 2022, the project is in Design status. Anticipated letting date is May 10, 2023. LADOT - Holton Harris Road Bridge *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents