Similar Projects
Dry Run Area Sewers Phase 2 Contract Round Bottom Road - Metropolitan Sewer District of Greater Cincinnati
New Construction, Infrastructure
Design
$5,184,500 CJ est. value
Milford, OH 45150

SR 132/SR 749 Preventive Maintenance
Infrastructure
Design
$2,354,670 CJ est. value
Batavia, OH 45103

Culvert Replacement - FY24
Infrastructure
Bidding
$693,141 CJ est. value
Batavia, OH 45103

Two Lane Resurfacing - SR 133
Infrastructure
Bidding
$8,418,990 CJ est. value
Williamsburg, OH 45176

Goshen Township Fire Station
Infrastructure
Post-Bid
$492,671 est. value
Milford, OH 45150

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Two Lane Resurfacing - CLE-US 50/SR 131-02.21/08.51
Infrastructure
Results
$1,402,692 est. value
Batavia, Milford, OH 45150

2022 Road Resurfacing Program
Infrastructure
Results
$7,637,631 est. value
OH

St Columban Community Center
Addition, Infrastructure - 15,373 SF
Construction
$4,000,000 CJ est. value
Loveland, OH 45140

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

New Elementary School - Williamsburg Local School District
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Williamsburg, OH 45176

Roadway Minor Rehab - SR 32
Infrastructure
Design
$7,078,610 CJ est. value
Batavia, OH 45103

Middle East Fork Wastewater Treatment Plant Improvements
Renovation, Infrastructure
Bidding
$6,993,000 CJ est. value
Batavia, OH 45103

Complete Streets Project at U.S 52 - New Richmond
Infrastructure
Post-Bid
$8,250,000 CJ est. value
New Richmond, OH 45157

Kennedy Avenue Improvements
Infrastructure
Results
$1,144,000 est. value
Cincinnati, OH

Last Updated 10/14/2023 07:36 AM
Project Title

Bridge Repair - FY2024

Physical Address View project details and contacts
City, State (County) Batavia, OH 45103   (Clermont County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $553,480 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

DBE 5.5 Completion Date : 9/1/2024 OH DOT - Bridge Repair - FY2024

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents