Similar Projects
Petroleum Storage Tank Site Activities
Infrastructure
Bidding
Austin, TX

Water Management Maintenance Repair Services
Renovation
Bidding
Houston, TX

Install Water Draw-Off System
Post-Bid
Corpus Christi, TX

Fuel Storage Tank Replacement
Post-Bid
Less than $250,000 est. value
Pearland, TX 77581

Aviation Fuel for Jack Brooks Regional Airport
Term Contract
Results
Less than $874,201 est. value
Taylor, TX 77705

High Pressure Gas Main Replacement
Results
Less than $7,800,000 est. value
Port Aransas, TX 78373

Oil Pure Purification System Falcon Power Plant
Term Contract
Bidding
Falcon Heights, TX 78545

Fleet Facility Fuel
Term Contract
Post-Bid
Galveston, TX 77554

Spill Prevention, Control and Countermeasure (SPCC) for Oil Piping
Results
$476,071 est. value
Dallas, TX 75261

Atmos Energy Gas Line Extension Project
Post-Bid
Forney, TX

Lease and Development of Fuel Station
Results
Conroe, TX 77301

Fuel Site Repairs and Service at Automotive Service Center Locations
Term Contract
Post-Bid
TX

Aviation Fuel Farm Storage Tank
Results
McKinney, TX 75069

Fuel Tank at Fire Station 4
Post-Bid
Irving, TX 75062

Annual Contract for Tank Cleaning and Fuel Circulation Services
Term Contract
Results
San Antonio, TX 78283

Reported 04/05/2022 11:18 AM
Project Title

Camp Mabry Infrastructure Gas Line

Physical Address View project details and contacts
City, State (County) Austin, TX 78703   (Travis County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the replacement of the natural gas line that feeds 2 (two) 200kW existing generators at building 10 and 11 and various other buildings at Camp Mabry. The new line will also feed a new 500kW generator that is being provided in the Microgrid project. The new gas line will be installed with some portions in an open cut trench and some portions installed with horizontal directional drilling. The approximate length of the gas line is 3,000 feet.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents