North Shore Doggy Daycare Expansion
Addition
Pending Verification
Glendale, WI 53209

Vine Farm Improvements
Renovation
Bidding
Greenwood, WI 54437

Dog Grooming Salon
Renovation - 1,550 SF
Pending Verification
$50,000 est. value
Manitowoc, WI

Woodman Dog Park Shelter
New Construction
Bidding
Richland Center, WI 53581

Ebert’s Greenhouse Village
New Construction - 6,600 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Ixonia, WI 53036

The Big Barn Dog Rescue Shelter
Renovation - 4,800 SF
Construction
$1,000,000 est. value
Salem, WI 53168

Last Updated 01/25/2021 12:46 AM
Project Title

Hoofstock Quarantine Building

Physical Address View project details and contacts
City, State (County) WI   (Milwaukee County)
Category(s) Animal/Plant/Fish Facility
Sub-Category(s) Animal/Plant/Fish Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

CONTRACT-1, Bid Package 1 The Hoofstock Quarantine Building is a new building enclosure consisting of a pre-engineered (field fabricated) Post Wood Frame Building System. The new enclosure shall have two (2) overhead insulated rolling service doors (south side) and three personnel doors. The new enclosure shall have a perimeter concrete grade beam with a concrete .pile cap / steel helical pier foundation system. Inside the pre-engineered enclosure are four (4) holding stalls of concrete masonry unit (CMU) construction. The stall wall top is 11’-4” above the finished floor line with a wire mesh ceiling. There will be a total of eight (8) sliding gates to allow the transfer of animals into or between each stall. Along the north and south side of the building are keeper corridors for zoo personnel to tend to the quarantine animals. B. Project Start: Site mobilization to begin construction shall be in the Spring of 2021, as soon as site conditions permit. C. Project Completion: Work of Contract shall be Substantially Complete no later than November 06, 2021.

Details

Division 13 - Special Construction, Kennels and Animal Shelters, Kennel Enclosures and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents