Last Updated | 10/05/2022 03:26 PM |
Project Title | Central Building Abatement and Re-Roof |
Physical Address | View project details and contacts |
City, State (County) | Baker City, OR 97814 (Baker County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $800,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Estimated budget: $500,000 to $800,000 The scope of this Project will include, but is not limited, removal of existing built-up roof system including abatement and disposal of asbestos materials and metal flashings. Removal, replacement, and repair of all damaged existing roof sheathing and other existing construction located on the roof. Installation of new structural sheathing and blocking with installation of mechanically fastened TPO single ply membrane and CSPE elastomeric roofing systems over including new metal flashings, wall reglets, roof drains, downspouts, and roof ventilation. Installation in select areas of new metal roofing panels and new roof access hatches with ladders. The total area of roofs is approximately 21,000 square feet The Central Building is currently unoccupied. The building a three-story historic stone building constructed in 1916-1917. It had been used as a school by the local school district since 2009 for uses other than storage. This is the first project in a series that will prepare this building for continued restoration and reuse. The Contractor will work under the direction of BTI and/or BTI's consultant and architect and will work in collaboration with other project stakeholders as necessary. This is a federally funded project, and EPA and DEQ will be involved in reviewing abatement activities and approving work completion, providing regulatory oversight as needed through the duration of the project. This will require compliance with either federal Davis Bacon Act wage rates or Oregon Bureau of Labor & Industries (BOLI) prevailing wage rates in accordance with Oregon state law, whichever is higher. No bid will be considered unless accompanied by certified check, cashier's check, or bid bond made payable to Baker Technical Institute in an amount equal to ten percent (10%) of the Basic Bid. Interest will not be allowed on bid security. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||
Details | 3 Stories Above Grade, 18,322 SF.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |