Similar Projects
Blower Building 090 Blower - 23R04 - North Shore Water Reclamation District
Alteration
Conception
$1,409,400 est. value
Gurnee, IL

UV System Upgrade - Construction - 23R23 - North Shore Water Reclamation District
Alteration
Conception
$3,147,200 est. value
Gurnee, IL

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Residences of Fox Meadows
New Construction, Infrastructure
Design
$205,000,000 CJ est. value
Nunda Township, IL 60050

Construct Career, Technical and Manufacturing Center - Phase 1
LEED Certification, New Construction, Infrastructure - 52,300 SF
Bidding
$22,000,000 CJ est. value
Crystal Lake, IL 60012

Shepherd's Crook Putting Green and Short Game Expansion
Infrastructure
Bidding
$200,000 CJ est. value
Zion, IL 60099

2021 Water Distribution Pressure Sensors
Post-Bid
Lake Forest, IL 60045

Forest Cove Sanitary Lift Station Replacement
Post-Bid
Waukegan, IL

McCormick Park Area Water Main Replacement
Results
Crystal Lake, IL 60014

Waveland Avenue Water Main and Storm Sewer Improvements
Results
$400,000 est. value
Gurnee, IL

Reconstruct the Intersection of Madison Street, South Street, and Lake Avenue
Infrastructure
Construction
$27,554,453 CJ est. value
Woodstock, IL 60098

Courtland Commons
New Construction, Infrastructure
Pending Verification
$1,487,300 CJ est. value
Mundelein, IL 60060

Enclave Apartments and Town Homes
New Construction, Infrastructure - 7,100 SF
Pending Verification
$20,000,000 CJ est. value
Crystal Lake, IL 60014

Clarifier Collection Systems - 18R01 - North Shore Water Reclamation District
Demolition, Alteration
Conception
$3,799,400 est. value
Gurnee, IL

Asphalt Sealcoating and Repairs at Raw Water Pump Station, Elevated Tank and Booster Pump Station Facilities
Infrastructure
Design
$200,000 CJ est. value
Lake Bluff, IL 60044

Last Updated 10/12/2022 12:06 AM
Project Title

Holiday Hills/ Le Villa Vaupell Sewer Extension - Phase 1

Physical Address View project details and contacts
City, State (County) Island Lake, IL 60042   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $6,227,127 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Questions should be directed to Terry Heitkamp (630) 587-0470 t.heitkamp@trotter-inc.com. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Water Pollution Control Loan Program (35IAC Part 365), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), Illinois Works Jobs Program Act Apprenticeship Initiative, and DBE Policy per 40 CFR Part 33, as amended. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4. In addition, this procurement is subject to the "Use of American Iron and Steel" requirements as contained in Section 436 (a) - (f) of the Consolidated Appropriations Act, 2014.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents