Similar Projects
MSS Environmental Abatementa and Removal
Results
$50,000 est. value
Denver, CO

Water and Soil Testing WCAO 2022
Results

F--Radiological Decommissioning Services, Denver Federal Center CO USA
Term Contract
Post-Bid
Lakewood, CO 80215

Replace Plumbing Abate Asbestos Centennial Building
Demolition, Alteration
Results
Denver, CO 80203

Replace Plumbing and Abate Asbestos
Alteration
Results
$200,000 est. value
Denver, CO 80203

BioWatch Air Sample Monitoring
Alteration
Results
Denver, CO

Traffic Cones and Signage for the City and County of Denver
Infrastructure
Post-Bid
$250,000 CJ est. value
Denver, CO 80202

DRUM Bishop Point Project
Term Contract
Post-Bid
Denver, CO 80202

FY23 Petrohunter Phase Two Reclamation Project
Infrastructure
Post-Bid
Denver, CO 80202

Aqua Golf Turf Replacement
Infrastructure
Post-Bid
$500,000 CJ est. value
Denver, CO 80223

Traffic Control and Mobilization Services
Term Contract
Post-Bid
Denver, CO 80202

Waste, Recycling and Compost Services
Term Contract
Post-Bid
Denver, CO 80202

Circular Economy Development Center
Term Contract
Sub-Bidding
Denver, CO 80202

Speed Limit Sign Replacement
Infrastructure
Results
$1,694,825 CJ est. value
Denver, CO 80202

Backflow Testing and Repair
Term Contract
Post-Bid
Denver, CO 80202

Last Updated 01/23/2023 02:08 PM
Project Title

Crane Rental Services

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City is looking for rental of crane services for removing and installing asphalt plant drag assembly, removing and installing traverse one and three, removing and installing batcher one, two and three, and the removal and installation of hot oil lines. Two large cranes and one rigger will be needed for the removal and installation of the asphalt plant drag assembly, traverse one and three, and batcher one, two and three. Estimated days for removal and installation: Four days - Asphalt drag plant assembly; two days - Traverse one and three; one day - batcher one, two and three, and one day - Hot oil lines. Question Deadline 01/13/2023 at 4:00 PM MT Questions are submitted online No Source ID PU.AG.USA.2323729.C13350401

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents