Similar Projects
Replace Hot Water Lines
Term Contract
Bidding
$500,000 to $2,000,000 est. value
Arnold, MO 63010

Copper Creek Waterline Extensions Phase 4
Infrastructure
Bidding
Peculiar, MO

Valve Testing and Repairs
Term Contract
Post-Bid
Columbia, MO

Butterfly Valves and Flanges
Post-Bid
Saint Louis, MO

Water System Improvements
Results
Milan, MO

2021 Water System Improvements
Results
Jefferson City, MO

Emergency Drought Water Supply Improvements
Infrastructure
Bidding
$175,000 to $225,000 est. value
Hamilton, MO

Highway Department Maintenance Facility - Phase 2
Post-Bid
Carthage, MO

Water Main Replacement in the Area of Booth Avenue to Willow Avenue, East 28th Terrace to East 50th Street
Results
Kansas City, MO 64129

Emergency Water Supply Connection
Infrastructure
Bidding
Hamilton, MO

Repair Kits and Knife Gate Valve
Post-Bid
Saint Louis, MO

Supplemental Workforce for Water Distribution System Repairs
Results
Kansas City, MO

Gans Creek Water Line Replacement (Bore Under Highway 63)
Infrastructure
Bidding
Columbia, MO

Clinton Peabody Water Damage/Mold Unit Repairs, 20 Units
Infrastructure
Post-Bid
Saint Louis, MO

Water Main Replacement
Renovation
Results
Less than $2,230,000 est. value
MO

Last Updated 08/20/2021 10:41 AM
Project Title

2019 Flood Repair of MSD Manholes

Physical Address View project details and contacts
City, State (County) Saint Louis, MO   (Saint Louis County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

2019 Flood Repair of MSD Manholes: Work consists of rehabilitating manholes w ith Cure-in-Place Manhole (CIPM) method. Concrete and asphalt pavement around manholes w ill be removed and if damaged or to the minimal extent possible to complete rehabilitation w ork. Pressure rated frame and lids w ill be replaced. Manholes w ill be cleaned and prepped before liner is placed. The liner w ill be low ered into the manhole and then, using heat and pressurization, the liner w ill be cured in place. Manholes that w ere damaged from high pressures w ill have the existing risers replaced in addition to CIPM lining. Pavement, gravel, and landscape surrounding manholes.

Details

Division 22 - Plumbing, Common Work Results for Plumbing, Facility Drainage Manholes.
Division 33 - Utilities, Operation and Maintenance of Utilities, Operation and Maintenance of Sewer Utilities, Sewer and Manhole Testing, Manhole Grout Sealing, Common Work Results for Utilities, Manholes and Structures, Manhole Grade Adjustment, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Utility Sewerage Structures, Sanitary Utility Sewerage Manholes, Frames, and Covers, Storm Drainage Structures, Storm Drainage Manholes, Frames, and Covers, Electrical Utility Transmission and Distribution, Electrical Underground Ducts and Manholes, Electrical Manholes and Handholes, Communications Structures, Communications Underground Ducts, Manholes, and Handholes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents