Similar Projects
Nampa Wastewater Treatment Plant Phase 3 - City of Nampa
Renovation, Infrastructure
Conception
$200,000,000 CJ est. value
Nampa, ID 83687

Black Butte Business Park Phase 3 / Nampa
New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Nampa, ID 83687

Terrace Falls Subdivision
New Construction, Infrastructure
Design
$37,956,488 CJ est. value
Nampa, ID 83686

McDermott Road Industrial
New Construction, Infrastructure - 703,300 SF
Design
$378,000,000 CJ est. value
Nampa, ID 83687

RFP - North West Triangle Hangar Development
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Caldwell, ID 83605

RFP - NE Rectangle Hangar Development
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Caldwell, ID 83605

2022, Ustick Road Widening, Ashton Avenue to I-84
Infrastructure
Post-Bid
$260,000 CJ est. value
Caldwell, ID 83687

Canyon Village Apartments / Caldwell
New Construction, Infrastructure - 13,866 SF
Post-Bid
$100,000,000 CJ est. value
Caldwell, ID 83607

2nd and 4th Street North Waterline Replacement Project FY22
Infrastructure
Results
$1,190,010 CJ est. value
Nampa, ID 83651

I-84 Galloway Rd Repair, I-84 Robinson and I-184 Orchard
Infrastructure
Results
$993,418 CJ est. value
Caldwell, ID 83607

Sonata Pointe West Townhomes - Phase 2
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
Nampa, ID 83651

Heron Ridge Residential Development - Phase 3
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Nampa, ID 83651

2023 Bond - Nampa School District
Demolition, New Construction, Infrastructure, Renovation
Conception
$210,200,000 CJ est. value
Nampa, ID 83651

Boulevard Logistics / Nampa
New Construction, Infrastructure - 670,000 SF
Design
$80,000,000 CJ est. value
Nampa, ID 83651

Stinker C-Store #122 / Nampa
Demolition, New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Nampa, ID 83687

Last Updated 03/22/2023 11:06 AM
Project Title

TownePlace Suites / Nampa

Physical Address View project details and contacts
City, State (County) Nampa, ID 83687   (Canyon County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 22, 2023, this project has been approved but has not yet applied for building permits. An architect has been selected. Information regarding general contractor has not been disclosed. Construction will begin mid-summer 2023.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents