Similar Projects
CCTC - F.E. Dubose Campus - HVAC Updates/Replacements
Renovation
Design
$1,300,000 CJ est. value
Manning, SC 29102

Hampton County Mhc Hvac Replacement
Renovation
Sub-Bidding
$45,000 CJ est. value
Varnville, SC 29944

Hartsville Middle School Auditorium HVAC Upgrades
Renovation
Sub-Bidding
$280,000 CJ est. value
Hartsville, SC 29550

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Chiller Replacement - Coastal Evaluation Center
Results
Ridgeville, SC 29472

HVAC Maintenance
Results
Darlington, SC 29532

Pee Dee Mental Health Center (MHC) Chiller and Boiler Replacement
Renovation
Construction
$312,859 CJ est. value
Florence, SC 29506

STP HVAC Relocation/Replacement
Renovation
Sub-Bidding
$280,000 CJ est. value
Saint George, SC 29477

Statement of Qualifications For HVAC And Electrical Contractors
Post-Bid
Conway, SC

HVAC and Control Energy Management System Replacement for Detention Center
Results
Beaufort, SC 29902

Beech Hill Elementary School Partial Roof Replacement
Renovation
Sub-Bidding
$700,000 CJ est. value
Summerville, SC 29483

Fresh Air and Exhaust System at Sandy Run K8 School
Post-Bid
Swansea, SC 29160

Air Purification Units
Results
Kingstree, SC

HVAC Air Filters - District Wide
Term Contract
Sub-Bidding
Newberry, SC 29108

Last Updated 09/02/2022 09:37 AM
Project Title

Detention Services and Equipment Upgrades Ridgeland Ci – Replace Chiller

Physical Address View project details and contacts
City, State (County) Ridgeland, SC 29936   (Jasper County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,968,842 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing Chiller, Pumps, and Cooling Tower systems and replace with new as indicated. Scope of work includes new electrical switch gear and feeders to units. Refer to documents for full scope and project requirements. Construction Cost Range: $1,500,000 to $1,700,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. a) CONTRACT TIME Bidder agrees that the Date of Commencement of the Work shall be established in a Notice to Proceed to be issued by the Agency. Bidder agrees to substantially complete the Work within 180 Calendar Days from the Date of Commencement, subject to adjustments as provided in the Contract Documents. b) LIQUIDATED DAMAGES Bidder further agrees that from the compensation to be paid, the Agency shall retain as Liquidated Damages the amount of $ 500.00 for each Calendar Day the actual construction time required to achieve Substantial Completion exceeds the specified or adjusted time for Substantial Completion as provided in the Contract Documents. This amount is intended by the parties as the predetermined measure of compensation for actual damages, not as a penalty for nonperformance.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents