Similar Projects
Domestic Water Heater Replacement
Alteration
Bidding
$190,000 est. value
Greensboro, NC 27401

Design-build Services for Air Quality and Associated Improvements
Alteration
Bidding
$6,500,000 est. value
Thomasville, NC

WTCC(Wake Tech Community College) General Education and Student Services Building I - Phase 3
Alteration
Sub-Bidding
$49,000,000 est. value
Raleigh, NC 27603

ECSU - Mechanical System Upgrades
Post-Bid
Less than $700,000 est. value
Elizabeth City, NC 27909

Sumner Elementary Chiller Replacement Project
Post-Bid
Greensboro, NC 27406

Union West Library Boiler Replacement
Results
Indian Trail, NC 28079

Steam Repairs Phase VIIIC
Results
$1,200,000 to $1,500,000 est. value
Raleigh, NC 27695

Clearwater Ceramics Center
Alteration
Construction
Concord, NC

South Providence - Steam Boiler Repair
Alteration
Bidding
$200,000 est. value
Waxhaw, NC 28173

Replacement Of A Boiler At East Iredell Middle School
Post-Bid
Statesville, NC 28625

Boiler Retubing
Results
Butner, NC 27509

Water Heater and HVAC Replacement
Alteration
Bidding
$200,000 est. value
Goldsboro, NC 27530

Removal and Replacement of Two (2) Hot Water Heaters
Post-Bid
Wilmington, NC

Building SJ - ILC Renovations
Results
Raleigh, NC

Steam and Boiler Water Treatment Services
Post-Bid
Kinston, NC 28504

Last Updated 06/15/2022 04:35 AM
Project Title

Public Works Building Chiller Replacement

Physical Address View project details and contacts
City, State (County) Asheville, NC 28801   (Buncombe County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $340,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

ABI Annual Construction Aspirational Participation Goal: MBE 4.6 % WBE 0%. This project encompasses the replacement of the existing chiller and chilled water pump at the Public Works building located at 161 S. Charlotte Street, Asheville, NC. The work includes the demo of the existing chiller, above ground piping and chilled water pump; pressure testing of existing underground pipe; and installation of new 90-ton air cooled chiller, above ground piping and base mounted, end-suction chilled water pump. Test and balance and integration of new equipment to the existing building controls system, is also part of the project scope. The bid also contains an add alternate for the re-routing of the existing chilled water pump piping.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents