Similar Projects
J044--PM Services for Boiler Plant with Options
Term Contract
Design
Manchester, NH 03104

HVAC - Boiler replacement
Alteration
Bidding
$30,000 est. value
Concord, NH 03301

Washington School District - Replacement of Boiler Plant
Post-Bid
Washington, NH 02380

Building Operations and Maintenance Services for Norris Cotton FB, Manchester, NH
Post-Bid
Manchester, NH

J--Boiler Cleaning Services F&O
Results
Manchester, NH 03104

Remove and Replace Boilers and Associated Equipment
Results
Less than $660,000 est. value
Concord, NH

Reverse Osmosis
Post-Bid
Nashua, NH 03060

Boiler Replacement
Results
Alton, NH 03809

N045--Suspended Pumps Replacement Services
Post-Bid
Manchester, NH

Standby Power and Boiler Replacement
Results
Less than $368,200 est. value
Lancaster, NH

Wastewater Treatment Plant - Biofilter Media Removal and Replacement
Alteration
Post-Bid
Manchester, NH

Vehicle Exhaust Rail System (Supply & Install)
Results

Activated Carbon Disposal and Replacement
Alteration
Post-Bid
Manchester, NH

Woodman Park Elementary Water Heater Replacement
Results
Dover, NH

Boiler Services
Term Contract
Post-Bid
Berlin, NH

Reported 04/12/2022 12:00 AM
Project Title

Berlin - Water Protection Control Facility Boiler Replacement

Physical Address View project details and contacts
City, State (County) Berlin, NH 03570   (Coos County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work Included: Upgrading the boiler and boiler feed system in the Boiler Room at the Berlin New Hampshire Water Pollution Control Facility (WPCF) located at 10 Shelby Street, Berlin New Hampshire 03570 to extents described herein and shown in Appendix A. Demolition and removal of existing oil-fired boiler, burner, trim, and associated appurtenances. Existing steam and condensate piping to be cut back as necessary to allow for installation of new boiler (refer to photos for extents of demolition in Appendix A).Demolition of existing boiler flue back to chimney and preparation for connection to new. Demolition of existing fuel oil supply and return piping and associated appurtenances back to transitions to steel. Disconnection of electrical wiring to pumps and boiler and preparation for reconnection to new.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents